Diagrams and Plans

Previous

Diagram D

DIAGRAM D.—BOAT, FROM 1 TO 6, IS BEARING AWAY OR KEEPING OFF FROM THE WIND; BOAT, FROM 8 TO 13, IS LUFFING OR NEARING THE WIND.

DIAGRAM C.

1— Close-hauled on port tack. 8— Jibed over to starboard tack.
2— Wind forward of the beam. 9— Wind on the quarter.
3— Wind abeam. 10— abaft the beam.
4— abaft the beam. 11— abeam.
5— on the quarter. 12— forward of the beam.
6— astern. 13— Close-hauled on starboard tack.
7— dead astern.

Spar and rigging plan of cat boat

SPAR AND RIGGING PLAN OF CAT BOAT.

SPAR AND RIGGING PLAN OF CAT BOAT.

1— Hull. 10— Peak halyards.
2— Cabin house. 12— bridle.
3— Main mast. 11— Throat
4— boom. 13— Jaws of gaff.
5— gaff. 15— Head stay.
6— Companionway or hatch. 16— Shroudy.
7— Main sheet. 17— Strut.
8— Topping lift. 18— Bitts.
9— Lazy jacks. 19— Cockpit.

Sail plan of cat boat

SAIL PLAN OF CAT BOAT.

SAIL PLAN OF CAT BOAT.

1— Mainsail. 6— Mainsail throat.
2— luff. 7— peak.
3— leach. 8— tack.
4— head. 8— clew.
5— foot.

Spar and rigging plan of pole mast sloop

SPAR AND RIGGING PLAN OF POLE MAST SLOOP.

SPAR AND RIGGING PLAN OF SLOOP.

1— Freeboard. 14— Preventer or shifting backstay.
2— Rail. 15— Gaff jaws.
3— Mast. 16— Boom jaws or gooseneck.
4— Main boom. 17— Shroud to hounds.
5— Gaff. 18— to mast head.
6— Bowsprit. 19— Peak halyard bridle.
7— Bobstay. 20— Fore stay.
8— Strut. 21— Jib stay.
9— Main sheet. 22— Fore staysail halyards.
10— Peak halyards. 23— Jib halyards.
11— Throat 24— Cockpit coaming.
12— Topping lift.
13— Lazy jacks.

Sail plan of pole mast sloop

SAIL PLAN OF POLE MAST SLOOP.

SAIL PLAN OF POLE MAST SLOOP.

1— Mainsail. 9— Fore staysail tack.
4— peak. 10— clew.
5— throat. 3— Jib.
5— tack. 11— head.
5— clew. 12— tack.
2— Fore staysail. 13— clew.
8— head.

Sail plan of topsail sloop

SAIL PLAN OF TOPSAIL SLOOP.

SAIL PLAN OF TOPSAIL SLOOP.

1— Mainsail. 14— Jib tack.
6— peak. 15— clew.
7— throat. 4— Jib topsail.
8— tack. 16— head.
9— clew. 17— tack.
2— Fore staysail. 18— clew.
10— head. 5— Topsail.
11— tack. 19— head.
12— clew. 20— clew.
3— Jib. 21— tack.
13— head.

Spar and rigging plan of yawl

SPAR AND RIGGING PLAN OF YAWL.

SPAR AND RIGGING PLAN OF YAWL.

1— Hull. 13— Main throat halyards.
2— Cabin house. 14— Mizzen peak
3— Cockpit rail or coaming. 15— throat
4— Main mast. 16— Main topping lift.
5— Mizzen mast. 17— Mizzen
6— Main boom. 18— Main shrouds.
7— gaff. 19— Mizzen
8— Mizzen boom. 20— Jib stay.
9— gaff. 21— halyards.
10— Main sheet. 22— Bowsprit.
11— Mizzen 23— Bobstay.
12— Main peak halyards 24— Boomkin.
25— stay.

Sail plan of yawl

SAIL PLAN OF YAWL.

SAIL PLAN OF YAWL.

1— Mainsail. 10— Mizzen throat.
4— peak. 11— tack.
5— tack. 12— clew.
6— throat. 3— Jib.
8— clew. 13— head.
2— Mizzen. 14— tack.
9— peak. 15— clew.

Sail plan of ketch

SAIL PLAN OF KETCH.

SAIL PLAN OF KETCH.

1— Mainsail. 17— Fore staysail clew.
7— peak. 4— Jib.
8— throat. 18— head.
9— tack. 19— tack.
10— clew. 20— clew.
2— Mizzen. 5— Jib topsail.
11— peak. 21— head.
12— throat. 22— tack.
13— tack. 23— clew.
14— clew. 6— Topsail.
3— Fore staysail. 24— head.
15— head. 25— clew.
16— tack. 26— tack.

Spar and rigging plan of schooner

SPAR AND RIGGING PLAN OF SCHOONER.

SPAR AND RIGGING PLAN OF SCHOONER.

1— Freeboard. 22— Main sheet.
2— Rail. 23— peak halyards.
3— Cabin house. 24— throat
4— Wheel. 25— peak halyards bridles.
5— Fore hatch. 26— Fore topping lift.
6— mast. 27— Main
7— topmast. 28— Preventer backstay or runner.
8— truck. 29— Topmast preventer backstay.
9— doublings. 30— Bowsprit.
10— Main mast. 31— Bobstay.
11— topmast. 32— Fore stay.
12— truck. 33— Fore staysail halyards.
13— Head of main mast and doublings. 34— Jib stay.
14— Fore boom. 35— halyards.
15— gaff. 36— topsail stay.
16— Main boom. 37— halyards.
17— gaff. 38— Triatic stay.
18— Fore sheet. 39— Spring stay.
19— peak halyards. 40— Main topmast stay.
20— throat
21— peak halyard bridles.

Sail plan of schooner

SAIL PLAN OF SCHOONER.

SAIL PLAN OF SCHOONER.

1— Mainsail. 5— Jib topsail.
9— peak. 22— head.
10— throat. 23— Jib topsail tack.
11— tack. 24— clew.
12— clew. 6— Main topsail.
2— Fore sail. 25— head.
13— peak. 26— clew.
14— tack. 27— tack.
15— clew. 7— Fore topsail.
3— Fore staysail. 28— head.
16— head. 29— clew.
17— tack. 8— Main topmast stays.
18— clew. 30— head.
4— Jib. 31— Upper tack.
19— head. 32— Lower tack.
20— tack. 33— Clew.
21— clew.

                                                                                                                                                                                                                                                                                                           

Clyx.com


Top of Page
Top of Page