APPENDIX. No. I.

Previous

CONTAINING A NOTICE OF ADDITIONAL LIGHT-HOUSE STATIONS, LIGHT-KEEPERS’ INSTRUCTIONS, FORMS OF MONTHLY AND SHIPWRECK RETURNS.

ADDITIONAL LIGHT-HOUSE STATIONS.

Additional Light-houses.

In noticing the different points alluded to, at page 60., as the most prominent stations for additional Light-houses on the coast of Scotland, we shall follow a course from east to west, including the Orkney and Shetland Islands.

Eastern Coast.

On the eastern coast two light-houses seem particularly to be required, in addition to the present Light on Kinnaird-Head. One of these, at Buchan-Ness, near Peterhead, which becomes a turning-point in the navigation of that coast, as will be seen from Plate III., would be an excellent guide to the southward, for shipping on the long flat shores of Aberdeenshire, and not less useful as a direction for the foul ground or sunken rocks called Rattray Briggs to the northward of Buchan-Ness. Some are also of opinion, that Girdle-Ness, at the entrance of Aberdeen harbour, would be a proper station for a sea or public Light. The next station in the order of position on the eastern coast, is Tarbetness, a centrical point of land extending into the Moray Firth , which leads to Cromarty Roads, a great rendezvous for shipping in stormy weather. A Light upon this projecting point would also be extremely useful as a direction to the numerous small ports of this district, and would prevent the losses which occasionally happen on Culloden Rock, and Halliman’s Scars, and by the Firth of Tain being mistaken for a continuation of the Moray Firth . It would also serve as a guide to the narrow passage of Fort George, leading to the eastern entrance of the Caledonian Canal.

Northern Coast.

Several Light-houses are still wanted for the protection of shipping on the Northern Coast. In particular we notice, that although the eastern entrance of the Pentland Firth is already well marked by the Light-house on the Skerries; yet the western approach to this dangerous, but important channel, requires a light upon Dunnet-head in Caithness, which would prevent vessels from mistaking Murkle Bay for the Pentland Firth , and, at the same time, form an excellent guide for the south-western coast of Orkney. Cape Wrath in Sutherland is the north-western point of the Mainland of Scotland, as will be seen from Plate III. A Light-house upon that promontory would be of great importance to the navigation of the dreary coast of Caithness and Sutherland, and as a direction for the sunken rock called the Nun, surveyed by Captain Ramage, in H. M. S. Cherokee in the year 1814; and by him found to lie 15 miles in a north-eastern direction from that shore. A light upon Cape Wrath would likewise serve as an excellent guide to the northern entrance of the Great and Little Minish, or Friths of Lewis and Uist, a central track in the navigation of the Hebrides, now much frequented by shipping since the erection of the Light-house upon Glass, one of the Harris Isles.

Orkney and Shetland Islands.

Perhaps the only additional light still wanted in Orkney, to which it is here necessary to allude, is one upon Nouphead of Westra, to direct shipping on the north-western side of these Islands. In addition to Sumburgh-head Light-house in Shetland, one upon the Out-skerries of Whalsey, on the east, another upon the Scaw of Unst, in the north; and a third on the Skerries of Ve, on the western side, would seem to render these Islands complete in regard to Light-houses.

Western Coast.

The opening of the sheltered passage through the Friths of Lewis and Uist, by the Light-house on Glass, has, in a great measure, superseded the use of the outward course of shipping by St Kilda, which is now seldom taken by coasting vessels, though a Light upon that island would be extremely useful to ships making the land from the Western Ocean. The next Light-house that seems wanting in connection with the navigation of the Minish is one upon the Island of Bara, as a direction to its western entrance by the Firth of Uist. It will only further be necessary, on this coast, to direct our attention to the position of the Rocks of Skerryvore, in order to perceive the importance of a light upon that dangerous reef, which lies about 12 miles south-west from the Island of Tiree. The principal rock here is a circular mass of granite, about 60 feet in diameter, and elevated about 20 feet above the highest tides. The rocks of Skerryvore prove not only a great bar to ships making the coast from foreign voyages, but, it is feared, have been fatal to many vessels sailing along these western shores.

The Rhins, a promontory forming the south-western extremity of the Island of Islay, is another position of importance for pointing out the northern side of the passage from the Atlantic to the Clyde and Irish Sea, between Islay and Bengore Head in Ireland. The Commissioners, at their meeting in the month of January 1823, having ordered a Light-house to be built at this station, it is accordingly in progress. The navigation of the sounds and tracks among the Western Isles would also be greatly facilitated by the erection of four Light-houses, of the smallest class of sea-lights, on stations connected with the inner Sounds of Skye and Mull. One of these lights, erected at the south entrance of the Sound of Mull, would not only be important to that passage, but to the various tracks leading to the Sounds of Islay, and by those of Linnehe and Loing, to the western entrances of the Caledonian and Crinan Canals. The Island Devaar, at the entrance of the much frequented anchorage of Campbeltown Loch, is another station for a small Light, to which the attention of the Board has been directed by the Shipping Interest of the Western Coast.

Although the lights upon the Point of Corsewall and Isle of Man, form a good direction for the southern coast of Scotland, yet a light upon the Mull of Galloway would still be of much utility in preventing northern-bound ships from mistaking Glenluce Bay for the Irish Channel; and in leading them along the Scotch side, between the Firth of Clyde and the Irish Sea. Application has also been made for the erection of a small Light upon the Little-Ross Island, at the entrance of Kirkcudbright-anchorage.

INSTRUCTIONS for the BELL ROCK LIGHT-KEEPERS.

Instructions to Light-Keepers.

I.—The Keepers of the Bell Rock Light-house are hereby instructed and directed to keep the lamps of the reflecting-apparatus burning bright and clear, from the going away of day-light in the evening till the return of day-light in the morning. The better to obtain this purpose, the period of night is to be divided into Watches, and each keeper in rotation will mount guard for three hours. The fountains of the lamps being daily supplied with oil, the wicks must be frequently trimmed in the course of the night, but more particularly at the end of each watch.

II.—The motion of the machinery of the reflector-frame must be so regulated, that one of the lights of the natural appearance, and one of those coloured red, shall be exhibited to the mariner in their most brilliant effect, in the course of every four minutes; or the reflector-frame must make one entire revolution in the space of eight minutes.

III.—The keeper on watch will look out for the occurrence of foggy or snowy weather, and during the continuance of either, the bells must be kept tolling both day and night.

IV.—At the end of each watch, the keeper respectively on duty must ring the house or bed-room bell, as the case may be, and thereafter remain at his post until he is relieved by the keeper in person whose turn it is to mount guard.

V.—In the event of any thing getting out of order about the machinery of the reflector-frame, so as to prevent its operation, the Lights, and also the Bell-hammers, if required, must be moved by hand, as nearly to the periodic time as possible, until the repair of the machine can be accomplished.

VI.—Should the stock of Oil in the Light-house by any means be reduced to 150 gallons, between the 1st day of October and the last day of February; or to 50 gallons between the 1st day of March and the 30th day of September, the number of lights on each side of the reflector-frame shall be reduced to three; but in the event of the stock of Oil being respectively lessened to one-half of the above quantities, or that any of the other stores essential to the support of the Light, are getting so low as to endanger its total failure, only one burner shall be lighted on each side of the reflector-frame, or four burners in all.

VII.—Unless, under these circumstances, a supply comes to hand, recourse must ultimately be had to the use of the Wax Candles in store.

VIII.—During any period that the stores or provisions appear to the acting Principal Light-keeper to be in danger of falling short, or in the event of sickness, or under any other circumstances considered of a calamitous and hazardous nature, the signal of distress shall be observed, by ceasing to hoist the Signal-ball at the stated periods, until the arrival of the Attending-vessel.

IX.—In all cases of difficulty, especially such as are referred to by the tenor of the Articles VI. VII. and VIII. of these Instructions, the acting Principal Light-keeper shall use his discretion and judgment in lessening the daily allowance of provisions, water, and fuel, according to his view of the circumstances of the case.

X.—No lights of any kind are to be left in such a situation as to endanger accident by fire. If at any time it should be found necessary to enter the store-room under night, the light must be carried in a lantern.

XI.—The better to ensure regularity and good order in the Light-house-duty, it shall be performed in three distinct departments. The keepers to shift in rotation weekly, from the performance of one department to another. These changes are to take place every Saturday-night.

XII.—The light-keeper performing the duty of the first department, shall, in the course of the day, supply the lamp-fountains with oil, and the burners with cotton; he shall clean the reflecting-apparatus, and all the utensils connected with the trimming of the lights. He shall also take his turn in mounting guard both day and night.

XIII.—The day-work of the second department includes the cleaning of the machinery-case, windows, walls, floors, and apparatus connected with the light-room, not already specified as coming under the first department; he shall likewise clean the balcony and library; the books of which must be dusted or cleaned on the first Saturday of every month. The keeper in this department will also take his turn at day and night watches.

XIV.—The third department includes the cleaning of the bed-room, kitchen, and provision store-room; together with the passages, stairs, and whole utensils connected with these apartments. He shall likewise cook the provisions, and take charge of them from the time of their being served out, until they are set upon the table in a prepared state. The keeper acting in this department shall only be subject to the performance of night-watches.

XV.—The acting Principal Light-keeper will mount guard in his turn by day and night, and do the duty of the first and second departments, but he is hereby exempted from personally performing the duty of the third department; he will, however, serve out the stores, and keep the light-room store in a cleanly and orderly state.

XVI.—The chimney or smoke-tube of the kitchen-range, and the windows of the several apartments, are to be cleaned on the last Saturday of every month, or as soon thereafter as the weather will permit: The performance of which is to be entered into the Monthly Return.

XVII.—The wharfs or cast-iron railways, rope-ladder (now brazen stair), shall, in like manner, be overhauled and examined during the period of spring-tides, on the full and change days of the moon. The condition of these works to be also regularly entered into the Monthly Returns.

XVIII.—The light-keeper on guard is to give immediate notice to the acting Principal-Keeper of the appearance of the Tender, or of any other vessel or boat, which is seemingly approaching the Rock; when the proper signals will be made as to the practicability and safety of landing, and the necessary attendance given; according to the instructions of the Signal-Book.

XIX.—The Keeper on watch between the hours of 9 and 10 in the morning, shall hoist the signal-ball to the flag-staff-head (if the weather will permit), and, in this position, allow it remain during that hour, when all is well; but in the event of foggy or stormy weather, such as shall obstruct the view with the telescope between the Light-house and the Signal-tower at Arbroath, the ball shall be hoisted between the hours of 1 and 2 in the afternoon, should the weather have then improved. These circumstances are to be stated in the Monthly Returns.

XX.—The keepers, in rotation, shall have leave, and be carried ashore in the Attending-vessel, at such periods as may best suit the service. When this occurs in regular succession, each of the four keepers will remain six weeks at the Light-house, and two weeks at Arbroath with their families.

XXI.—The keeper who for the time being is on leave at the establishment at Arbroath, will there attend the duty of the signal-room, from 9 to 10 every morning, and likewise from 1 to 2 in the afternoon, when, from the state of the weather, the signals at the Bell Rock cannot be seen and repeated at the appointed hour in the morning, agreeably to Article XIX.

XXII.—The rotation for leave on shore must be so regulated, that the turns of the Principal and Principal-assistant Light-keepers do not immediately or successively follow each other.

XXIII.—When at the Light-house, the keepers will have Rations of provisions and other allowances, as stated in the annexed Schedule, but while they are on shore they provide for themselves.

XXIV.—In case the Rations served out should not at any time be used, the same must be returned to the store, as no provisions of any kind are permitted to be taken away from the Light-house.

XXV.—The Principal Light-keeper, and, in his absence, the Acting Principal-keeper, is held responsible for the due performance of the duty of the other keepers; for the correctness of the Requisitions made for stores; for the Monthly Returns written by the Assistant or Expectant Light-keepers; for all Entries made in the store and journal books; for the regular and properly serving out of the daily allowance of light-room stores and provisions; for the regular use and cleanly state of the bed and table linen; for the good order of the Light-house furniture, apparatus and appurtenances; that none of the stores be wasted or embezzled, but that the strictest economy and careful management be observed, yet so as to preserve a good and sufficient light.

XXVI.—The light-keepers are hereby prohibited from receiving, bringing, or allowing to be brought to the Light-house, any spiritous liquors, as private stores. The Acting Principal Light-keeper is held responsible for the conduct of his assistants; and the Master of the Tender for the conduct of his men in this respect.

XXVII.—The Bell Rock being the chief station at which Light-keepers are instructed in their duty for the service of the Northern Lights, the Principal, or, in his absence, the Acting-principal Keeper, is directed to superintend this department, and they are respectively held responsible for the certificate they may ultimately give as to the qualifications of Expectant-keepers. Upon production of the certificate to the Engineer, the light-keepers will be found entitled to the premium stated in the annexed Schedule of Allowances.

XXVIII.—Each Expectant-light-keeper is to be resident for at least six weeks at the Bell Rock. In the course of this period he is to practise the whole duty performed in the light-room; to write the Monthly Returns; and carefully to peruse these Instructions. If, at the end of this period, he is found qualified, he will receive a certificate to the following effect: “Bell Rock Light-house,” (here insert the date.) “These certify, That” (here insert the name,) “has resided” (here insert the number of) “days at this Light-house; and having been duly instructed in the whole practice of the Keeper’s duty in the Light-room, he is considered qualified to act as an Assistant Light-keeper,” or is found deficient in certain points, (here state the case as it may be.) “Witness my hand,” (Signature of Principal, or, in his absence, of the Principal Assistant Light-keeper.)

XXIX.—The Inventory of the Light-house apparatus, books, furniture, and utensils, is to be compared with the Inventory-book upon the first Friday of the months of May and November half-yearly, or as soon thereafter as the Principal and Principal Assistant Light-keepers are both upon the Rock. Any deficiency in the articles of the Inventory-Book is to be stated in the respective Returns for these months.

XXX.—It being a rule in the Service of the Commissioners of the Northern Light-houses, that access to their establishments shall be free and open to the Public, the keepers are enjoined to pay attention to Strangers, shewing them every civility in their power; and, particularly, to afford their aid and assistance, in cases of Ship-wreck; yet so as not to neglect any thing incumbent upon them, in the proper discharge of their duty as light-keepers.

XXXI.—It is recommended to the light-keepers to be cleanly in their persons and linens, and proper in their apparel in general.

XXXII.—The Light-keepers are enjoined to assemble in the Library, for the purpose of reading the Scriptures, and for Prayers, every Sunday, at 12 o’clock noon, in their Uniform-dress. This service is to be performed by the Acting Principal Light-keeper, or Principal Officer of the Board present. The table is to be covered during this service with a flag; and, when the weather is moderate, the Light-house flag is, at the same time, to be hoisted to the mast-head, and allowed to remain till sunset.

XXXIII.—Should any difference of opinion arise among the Light-keepers about the meaning of these Instructions, the duty shall in such cases be performed agreeably to the explanation and orders of the Acting Principal Light-keeper. In the same manner, in all matters to which these Instructions may not seem fully to apply, the orders of the Acting Principal Light-keeper are hereby declared to be binding upon the respective Light-keepers.

XXXIV.—In case of neglect of duty on the part of any of the Assistant-keepers, the Principal shall, according to the nature of the offence, communicate the circumstances to the Superintendant Light-keeper, on his first visit, or immediately by letter to the Engineer, that the offending party may be reprimanded, put under stoppages, or ultimately dismissed from the service, as the case may require.

XXXV.—These Instructions, with such additional orders as may be issued from time to time, are to be read by the officiating Officer, immediately before reading Prayers, on the first Sunday of the months of May and November.

Edinburgh, 1st August 1823.

ROBERT STEVENSON,
Engineer to the Commissioners of the Northern Light-houses.


SCHEDULE referred to in the XXIII. and XXVII. Articles of the INSTRUCTIONS.

Daily Allowance per Man, 1 lb. Beef; 1 lb. Bread; 2 oz. Oatmeal; 2 oz. Barley; 2 oz. Butter; 3 quarts Beer; Vegetables and Salt no stated allowance; For Tea and other necessaries 4d. per day; For instructing each Expectant-Light-keeper L.2, distributed as follows, viz. Principal Light-keeper 15s., Principal-Assistant 10s., each of the two Ordinary Assistants 7s. 6d.

MONTHLY RETURN from the BELL ROCK LIGHT-HOUSE, for November 1812.

Monthly Return.

Key:
A Spermaceti Oil, in Gallons.
B Wicks in Dozens
C Lamp glasses
D Beef, in Lib.
E Bread, in Lib.
F Oatmeal in Lib.
G Barley, in Lib.
H Butter, in Lib.
I Beer, in Qrts.
J Water, in Gallons
K Coals in Cwts
L Vegetables in Dozens
M Number of People victualled

Light-House Stores received. Provisions, Water, and Fuel, received.
Nov. 1812. A B C D E F G H I J K L M
Stock on hand, 313 593 360 263 243 72 32 2 200 615 60 11
Sunday, 1. 8
Monday, 2. 8
Tuesday, 3. 200 60 112 160 200 12 6 9
Wednesd. 4. 9
Thursday, 5. 9
Friday, 6. 8
Saturday, 7. 8
Sunday, 8. 8
Monday, 9. 8
Tuesday, 10. 8
Wednesd. 11. 8
Thursday, 12. 8
Friday, 13. 8
Saturday, 14. 8
Sunday, 15. 8
Monday, 16. 8
Tuesday, 17. 8
Wednesd. 18. 8
Thursday, 19. 8
Friday, 20. 100 37 80 4 3 3
Saturday, 21. 3
Sunday, 22. 3
Monday, 23. 3
Tuesday, 24. 3
Wednesd. 25. 3
Thursday, 26. 3
Friday, 27. 3
Saturday, 28. 3
Sunday, 29. 3
Monday, 30. 3
Received, 613 593 360 360 355 72 32 25 440 815 76 20 188
Expended, 111¼ 12 36 188 188 23½ 23½ 23½ 376 260 19 13½
Remainder in Store, 501¾ 581 324 172 167 48½ 64 555 57

Key:
AB Spermaceti Oil. Galls.
AC „ Qs.
AD „ Pts.
BB Wicks in Dozens
CC Lamp Glasses
DD Number of Lamps in Light-Room.
EE Beef in Lib.
FF Bread, in Lib.
GG Oatmeal in Lib.
HH Barley, in Lib.
II Butter, in Lib.
JJ Beer, in Qts.
KK Water, in Gallons
LL Coals in Cwts
MM Vegetables used.

Light-House Stores served out. Provisions, Water, and Fuel, served out.
Nov. 1812. AB AC AD BB CC DD EE FF GG HH II JJ KK LL MM
Stock on hand,
Sunday, 1. 3 2 24 8 8 1 0 1 0 1 0 16 6
Monday, 2. 3 2 24 8 8 1 0 1 0 1 0 16 6
Tuesday, 3. 13 2 6 24 9 9 1 2 1 2 1 2 18 30 6
Wednesd. 4. 3 2 24 9 9 1 2 1 2 1 2 18 2 6
Thursday, 5. 3 2 24 9 9 1 2 1 2 1 2 18 1 6
Friday, 6. 3 2 24 8 8 1 0 1 0 1 0 16 6
Saturday, 7. 3 2 6 24 8 8 1 0 1 0 1 0 16 2 6
Sunday, 8. 3 2 6 24 8 8 1 0 1 0 1 0 16 6
Monday, 9. 3 3 24 8 8 1 0 1 0 1 0 16 40 6
Tuesday, 10. 3 2 24 8 8 1 0 1 0 1 0 16 2 6
Wednesd. 11. 4 0 24 8 8 1 0 1 0 1 0 16 6
Thursday, 12. 4 0 24 8 8 1 0 1 0 1 0 16 2 6
Friday, 13. 3 2 24 8 8 1 0 1 0 1 0 16 6
Saturday, 14. 3 2 6 24 8 8 1 0 1 0 1 0 16 6
Sunday, 15. 3 3 24 8 8 1 0 1 0 1 0 16 2 6
Monday, 16. 3 3 24 8 8 1 0 1 0 1 0 16 150 6
Tuesday, 17. 3 3 24 8 8 1 0 1 0 1 0 16 6
Wednesd. 18. 3 3 24 8 8 1 0 1 0 1 0 16 2 6
Thursday, 19. 3 3 24 8 8 1 0 1 0 1 0 16 6
Friday, 20. 3 3 6 24 3 3 0 6 0 6 0 6 6 4
Saturday, 21. 3 3 24 3 3 0 6 0 6 0 6 6 2 4
Sunday, 22. 3 2 24 3 3 0 6 0 6 0 6 6 4
Monday, 23. 4 0 24 3 3 0 6 0 6 0 6 6 4
Tuesday, 24. 4 0 24 3 3 0 6 0 6 0 6 6 4
Wednesd. 25. 3 3 6 24 3 3 0 6 0 6 0 6 6 2 4
Thursday, 26. 4 0 24 3 3 0 6 0 6 0 6 6 4
Friday, 27. 3 3 24 3 3 0 6 0 6 0 6 6 40 4
Saturday, 28. 4 0 24 3 3 0 6 0 6 0 6 6 4
Sunday, 29. 3 3 24 3 3 0 6 0 6 0 6 6 4
Monday, 30. 4 0 6 6 24 3 3 0 6 0 6 0 6 6 2 4
111 1 12 36 188 188 23 23 0½ 23 0 376 260 19 13
Carried to return for next month.

Written by M. Wishart, Assist.
Principal or Principal Assistant Light-Keeper’s Signature, John Reid, Prinl.

JOURNAL relative to the Duty of the Light-Keepers, and the State of the Weather, &c. at the Bell Rock, for November 1812.

Nov. 1812. Time of Extinguishing, A.M. Time of Lighting, P.M. Night-Watch Set, P.M. Keeper on First Watch. Keeper absent on Leave. Tolling of Bells begun. Tolling of Bells ceased.
Sunday, 1. 6.50 4.55 5 J. Reid Wishart
Monday, 2. 6.20 4.55 - J. Bonyman
Tuesday, 3. 6.30 4.55 - H. Leask
Wednesday, 4. 6.25 5. - Reid Bonyman
Thursday, 5. 6.25 4.45 - Leask
Friday, 6. 6.40 4.45 - M. Wishart 8 A.M. 10 A.M.
Saturday, 7. 6.45 4.40 - Reid
Sunday, 8. 6.50 4.40 - Leask
Monday, 9. 6.40 4.45 - Wishart
Tuesday, 10. 6.45 4.35 - Reid
Wednesd. 11. 6.30 4.35 - Leask
Thursday, 12. 7. 4.30 - Wishart
Friday, 13. 6.55 4.30 - Reid
Saturday, 14. 6.30 4.30 - Leask
Sunday, 15. 7. 4.20 - Wishart
Monday, 16. 6.55 4.20 - Reid
Tuesday, 17. 7. 4.20 - Leask
Wednesd. 18. 7.5 4.20 - Wishart
Thursday, 19. 7. 4.15 - Reid
Friday, 20. 7.15 4.10 - Leask
Saturday, 21. 7.15 4.10 - Wishart
Sunday, 22. 7. 4.10 - Reid
Monday, 23. 7. 4.10 - Leask
Tuesday, 24. 7.10 4.10 - Wishart
Wednesd. 25. 7.10 4.15 - Reid
Thursday, 26. 7.20 4.10 - Leask
Friday, 27. 7.15 4.5 - Wishart
Saturday, 28. 7.20 4.15 - Reid
Sunday, 29. 7.10 4.10 - Leask 12 noon 10 P.M.
Monday, 30. 7.10 4.10 - Wishart
Prevailing State of the Weather.
Nov. 1812. Foggy,
Snowy.
Hazy, H.
Rain, R.
Clear, C.
Wind
Calm, C.
Barom. in Inches at 8 A.M. Therm. in Degrees at 8 A.M.
Sunday, 1. R.H. S.W. 29.40 46
Monday, 2. C. W.S.W. 29.50 42
Tuesday, 3. C. West. 29.68 42
Wednesday, 4. C. N.N.W. 29.69 43
Thursday, 5. C. North. 29.70 45
Friday, 6. Foggy, C. North. 29.50 45
Saturday, 7. C. N.N.E. 29.60 50
Sunday, 8. H. Variable. 29.88 50
Monday, 9. C. S.E. 30.10 49
Tuesday, 10. C. Variable. 30.12 48
Wednesd. 11. C. N.E. 30.30 48
Thursday, 12. H.R. N.E. 29.90 45
Friday, 13. H.R. S.E. 29.52 42
Saturday, 14. H.R. S.S.E. 29.60 43
Sunday, 15. H.R. N.E. 29.65 41
Monday, 16. H.R. N.E. 29.92 41
Tuesday, 17. H. East. 29.41 44
Wednesd. 18. H. N.E. 29.70 43
Thursday, 19. C. N.N.E. 29.22 45
Friday, 20. C. Variable. 29.50 45
Saturday, 21. H. N.W. 29.47 50
Sunday, 22. H. W.S.W. 29.58 49
Monday, 23. H. W.S.W 29.60 46
Tuesday, 24. H.R. Variable. 29.50 45
Wednesd. 25. R.H. N.E. 29.86 45
Thursday, 26. R.H. E.N. 29.66 49
Friday, 27. C. S.S.E. 29.97 48
Saturday, 28. H. S. by E. 30.23 47
Sunday, 29. Foggy, H. Variable. 30.34 43
Monday, 30. C. S.W. 30.15 43
30) 892.25 1356
Average, 29.742 45.2
Supposed rise at High Water on the Building of Tender’s Boat Sick, and unable for Duty. Number of Strangers on the Rock.
Nov. 1812. Tide. Spray. Arrives. Departs.
Sunday, 1. 8 40 5 Artificers.
Monday, 2. 9 40
Tuesday, 3. 10 40 8 A.M. 10 A.M. 2 Surveyors.
Wednesday, 4. 11 40 8 A.M. 9.30 A.M. 2 depart.
Thursday, 5. 11 50 10 A.M. 10.15 A.M.
Friday, 6. 11 70
Saturday, 7. 10 40
Sunday, 8. 9 40
Monday, 9. 9 40
Tuesday, 10. 8 40
Wednesd. 11. 8 50
Thursday, 12. 7 50
Friday, 13. 7 40
Saturday, 14. 8 60
Sunday, 15. 8 96
Monday, 16. 9 60
Tuesday, 17. 9 70
Wednesd. 18. 10 60
Thursday, 19. 11 50 7 A.M. 10 A.M. 5 depart.
Friday, 20. 11 50
Saturday, 21. 10 40
Sunday, 22. 10 50
Monday, 23. 9 40
Tuesday, 24. 9 50
Wednesd. 25. 8 90
Thursday, 26. 8 40
Friday, 27. 8 40
Saturday, 28. 8 40
Sunday, 29. 9 30
Monday, 30. 9 30

Written by M. Wishart, Assist.
Principal or Principal Assistant Light-Keeper’s Signature, John Reid, Prinl.

REMARKS regarding any Accident or Particular which occurred connected with the Bell Rock Light-house during the Month of November 1812.

1812.

Nov. 1. The first part of these twenty-four hours strong gales, with much rain, middle and latter parts moderate and changeable.

... 3. Blowing fresh breezes to-day, with fine clear weather. At 8 A.M. the Light-house Yacht’s boat landed twenty ankers of spermaceti oil. Mr John Steedman, and Mr William Lorimer, from Mr Stevenson’s office, also came to the Rock to do business at the House. Returned by the boat one anker of dregs of oil, with a box of broken lamp-glasses, together with 20 empty casks. One mason went ashore.

... 4. At 8 A.M. the Yacht’s boat landed, and made two trips with a variety of articles and materials for the joiners, and provisions for the use of the house. Returned some extra bolts. Mr Steedman and his assistant employed with their instruments measuring the Rock at low-water.

... 5. These twenty-four hours, strong breezes with clear weather. At 10 A.M. the Yacht’s boat landed, and took off Mr Steedman and Mr Lorimer.

... 15. A constant gale, with much rain until the 19th, when it fell moderate. The signal-ball was not hoisted to-day, as an intimation ashore that the artificers were ready to leave the Rock.

... 20. Variable weather to-day, with flying showers. At 7 A.M. the Tender’s boat landed at three trips, with water, fuel, and provisions, for the use of the House, and ten ankers of oil for the use of the Light-room. At 10 o’clock the boat departed, when Mr Slight, James Glen, Robert Selkirk, and two others, left the Rock to proceed to the shore for the season.

... 23. All these twenty-four hours it blew strong gales, with very hazy weather. Signal-ball not hoisted, owing to the state of the weather.

... 25. Blowing a gale with much rain. Signal-ball not hoisted.

... 26. Do. weather with much sea.

... 29. First and middle parts of these twenty-four hours hazy and variable. Middle parts foggy and calm, with frost. Bells tolling. Signal-balls not hoisted.

... 30. Fine clear weather. Cleaned the chimney to-day.

Written by, M. Wishart, Assist.
Principal or Principal Assistant Light-keeper’s Signature. John Reid, Prinl.

To Robert Stevenson, Esq.
Engineer for Northern Light-houses,
Edinburgh.

Note.—Similar Monthly Returns are also sent from the other Light-house Stations, independently of which, the Light-keepers are directed to correspond with the Engineer as often as the circumstances of the Service require.

SHIPWRECK RETURN from Pladda Light-House.

Shipwreck Return.

DESCRIPTION of Vessels or Boats Wrecked within Fifty Miles of any of the Northern Light-House Stations, to be immediately communicated to the Engineer, in so far as the circumstances can be ascertained by the observation or diligent inquiries of the respective Light-Keepers; who are also instructed to render every assistance in their power to Shipwrecked Mariners; without however neglecting the proper duties of their charge.

Date. Ship, Brig, Schooner, or Sloop, &c. Belonging to what Port. Name of the Vessel. Name of the Commander.
Tuesday, 18th February 1823. Sloop, Greenock, Atlas, Alexander Duncan.
Where Wrecked. At what Hour Wrecked, A.M. or P.M. In what kind of Weather. No. of the Crew or Passengers Saved. No. of the Crew or Passengers Lost. Whence from. Where Bound.
Island of Pladda, to the S. W. of the Light-house. At 5 A.M. Stormy, Hazy Weather. Wind S. S. E. 5 none. Sydney. Greenock.
Cargo. Tonnage. Supposed Value of the Vessel. Supposed Value of the Cargo.
British Oak Timber. 75 £ 400 0 0 £ 200 0 0

Principal or Assistant’s Signature, William Soutar, Prinl.

Note.—It fortunately happens that no instance of Shipwreck has occurred at the Bell Rock since its erection; and therefore a Return from one of the other Light-house Stations is given.

LETTER accompanying the foregoing Shipwreck Return.

SIR,

I beg leave to inform you, that this vessel was observed by the keeper on watch in the Light-room to be ashore at 5.30 A.M., who gave the alarm to all the inmates of the Light-house; but no assistance could be given to the crew by us till 8.30 A.M., when the tide ebbed so far that they could heave us a rope; then we assisted them in getting their clothes, and themselves, and some other articles, ashore. It is thought by the Captain and crew that the vessel will not be got off. As it happened to be about high-water when she came ashore, she is very far up on the shore, and ebbs almost dry at low-water, although it be neap-tides.

The report given us by the Captain and crew is, that they thought to have weathered this island, as they had the light three points on their weather-bow; but having so little sail set at the time, they observed they were so near the shore they thought the vessel would not stay. Their jib and top-sail was all the sail they could carry to the storm. They say they were in the act of setting a small bit of the peak of their mainsail when the vessel struck, to enable them to keep more to windward of the island.

Wednesday, 19th. At low-water, the Captain and crew, with other assistance, stripped the vessel of her sails and materials, which were carefully laid aside, and partly got into the store-house. Nothing more particular about the wreck at this date; but we shall be as serviceable to the unfortunate men as we can.

I remain,
SIR,
Your most obedient humble Servant,
WILLIAM SOUTAR.

To Robert Stevenson, Esq.
Engineer for Northern Light-Houses, Edinburgh.

No. II.
INCHCAPE ROCK.

Extracted, by Mr Southey’s permission, from his Minor Poems, Vol. III. p. 148.

An old writer mentions a curious Tradition, which may be worth quoting. “By east of the Isle of May,” says he, “twelve miles from all land in the German Seas, lyes a great hidden rock, called Inchcape, very dangerous for navigators, because it is overflowed every tide. It is reported in old times, upon the saide rocke there was a bell, fixed upon a tree or timber, which rang continually, being moved by the sea, giving notice to the saylers of the danger. This bell or clocke was put there and maintained by the Abbot of Aberbrothok, and being taken down by a sea pirate, a yeare thereafter he perished upon the same rocke, with ship and goodes, in the righteous judgment of God.”

Stoddart’s Remarks on Scotland.

No stir in the air, no stir in the sea,
The Ship was still as she could be;
Her sails from heaven received no motion,
Her keel was steady in the ocean.
Without either sign or sound of their shock,
The waves flow’d over the Inchcape Rock;
So little they rose, so little they fell,
They did not move the Inchcape Bell.
The Abbot of Aberbrothok
Had placed that bell on the Inchcape Rock;
On a buoy in the storm it floated and swung,
And over the waves its warning rung.
When the Rock was hid by the surge’s swell,
The Mariners heard the warning Bell;
And then they knew the perilous Rock,
And blest the Abbot of Aberbrothok.
The Sun in heaven was shining gay,
All things were joyful on that day;
The sea-birds scream’d as they wheel’d round,
And there was joyaunce in their sound.
The buoy of the Inchcape Bell was seen
A darker speck on the ocean green;
Sir Ralph the Rover walk’d his deck,
And he fix’d his eye on the darker speck.
He felt the cheering power of spring,
It made him whistle, it made him sing;
His heart was mirthful to excess,
But the Rover’s mirth was wickedness.
His eye was on the Inchcape Float;
Quoth he, “My men, put out the boat,
And row me to the Inchcape Rock,
And I’ll plague the Abbot of Aberbrothok.”
The boat is lower’d, the boatmen row,
And to the Inchcape Rock they go;
Sir Ralph bent over from the boat,
And he cut the Bell from the Inchcape Float.
Down sunk the Bell with a gurgling sound.
The bubbles rose and burst around;
Quoth Sir Ralph, “The next who comes to the Rock
Won’t bless the Abbot of Aberbrothok.”
Sir Ralph the Rover sail’d away,
He scour’d the seas for many a day;
And now grown rich with plunder’d store,
He steers his course for Scotland’s shore.
So thick a haze o’erspreads the sky
They cannot see the sun on high;
The wind hath blown a gale all day,
At evening it hath died away.
On the deck the Rover takes his stand,
So dark it is they see no land.
Quoth Sir Ralph, “It will be lighter soon,
For there is the dawn of the rising Moon.”
“Canst hear,” said one, “the breakers roar?
For methinks we should be near the shore.”
“Now, where we are I cannot tell,
But I wish we could hear the Inchcape Bell.”
They hear no sound, the swell is strong;
Though the wind hath fallen they drift along,
Till the vessel strikes with a shivering shock,
“Oh Christ! it is the Inchcape Rock!”
Sir Ralph the Rover tore his hair;
He curst himself in his despair;
The waves rush in on every side,
The ship is sinking beneath the tide.
But even in his dying fear
One dreadful sound could the Rover hear,
A sound as if with the Inchcape Bell,
The Devil below was ringing his knell.
1820.

No. III.

Light-house Duties.

ABSTRACT ACCOUNT of LIGHT-HOUSE DUTIES, furnished to the Committee of the House of Commons, in reference to the Bell Rock Act.

“ABSTRACT STATE of ADDITIONAL DUTIES that will arise from the District to be included in the Collection by the Erection of a Light-House on the Cape or Bell Rock; calculated from the Custom-House Returns, 13th May 1806, at the rate of 1½d. per ton, whether Outwards or Inwards.

‘ 1804. Foreign, Inwards, 93,782
Outwards, 67,633
Coastways, Inwards, 239,037
Outwards, 170,174 Tons.
———— 570,626 L.3566 8 3
‘ 1805. Foreign, Inwards, 81,123
Outwards, 73,289
Coastways, Inwards, 259,997
Outwards, 203,564
———— 617,973 3862 6 7½
‘ 1806. Foreign, Inwards, 97,205
Outwards, 86,739
Coastways, Inwards, 270,737
Outwards, 215,637
———— 670,318 4,189 9 9
Total of three years, 1,858,917 L.11,618 4 7½
“The tonnage of the ports of the Firth of Forth, already pay ½d. per ton for Inchkeith light, so that the additional duty payable by them, will be only one penny per ton, the total tonnage thus paying ½d. is, for the whole three years, 971,482.
Deduct, therefore, ½d. per ton for this amount, L.2023185
Deduct also expences of collection, and the charges of management, say 15 per cent. 1742149
3766132
“Nett total for three years, L.7851115½
“Nett yearly total L.261739½

(Signed) “C. Cuningham,
Secretary to the Commissioners of the Northern Light-houses.”

Note.—The District of coast referred to in the above Abstract, lies between Peterhead, in Aberdeenshire, towards the north, and Berwick-upon-Tweed, to the south, both inclusive.

No. IV.

Relative Reports.

Containing REPORTS relative to the Bell Rock Light-House, addressed to the Commissioners of the Northern Light-houses, by John Rennie and Robert Stevenson, Civil Engineers.

REPORT by Mr Stevenson.

During the reign of his present Majesty (George III.), a spirit for discovery and improvement, in maritime affairs, has been pursued with the greatest energy, and crowned with a success, which can only be equalled by the happy effects that have followed to commerce. In proportion, therefore, as the pursuits of the navigator are considered essential to the wealth of the community, every effort to Assist him, in his course through the pathless ocean, must be regarded both as the call of interest and humanity. The most prominent causes of the perfection to which coasting-navigation has been brought, may be ascribed to the accuracy of our charts, and an increase of land-marks, by which the mariner, after braving the dangers of the seas, is enabled to guide his ship with safety into her intended port. It is well known, that before the Maritime Survey of the Orkneys and Hebrides, by Mackenzie; and until an act of Parliament was passed, appointing Commissioners for erecting Light-houses upon the coast of Scotland, mariners were left to grope their way from the Firth of Forth to the Firth of Clyde, without the assistance either of proper charts or land-marks. Under these circumstances, they passed the Pentland Firth , and generally held a course to the northward of the Orkney islands; then steering westward, they sailed on the outward side of the Lewis Isles into the Atlantic Ocean, exposed to many dangers, and unable to avail themselves of the advantages of the sheltered sounds and harbours of the Friths of Lewis and Uist. Hence the difficulty of navigating this district, was long a great bar to the improvement of the Highlands, and to the extension of the British fisheries. It was, likewise, a material drawback to the present flourishing trade, carried on through these sounds to the Baltic and other parts of the northern Continent of Europe.

From the earliest accounts which tradition gives of the navigation of the Firth of Forth, a Light-house upon the Bell Rock appears to have been looked forward to as an essential pre-requisite to the advancement of its commerce: And in proportion to the extent of the one, the call for the other has become more and more urgent, and is now regarded as a matter of the greatest importance.

Since the publication of Adair’s Charts, there has been no want of a survey of the Firth of Forth; but this important estuary still remains extremely deficient with regard to land-marks, and the reporter will venture to say, that there is not any where a more dangerous reef in the kingdom, or one that calls more loudly for something to be done, than the Cape or Bell Rock. When, therefore, the extensive benefits derived from those powers, which have enabled the Commissioners of the Northern Light-houses to erect and maintain six Light-houses upon the coast, are considered, it is much to be wished that some measure were adopted for enabling that Board to add to the number of these land-marks, by the erection of one upon this most destructive rock. From the numerous losses by shipwreck, which have happened upon the Bell Rock, it is presumed, that some account of its position and extent, from actual survey,—a few remarks upon the description of building best suited to the situation of the rock,—together with an attempt to point out the extensive use of such a light,—and the ports which appear to be within the limits of any duty to be levied for its support, will not be deemed unnecessary at a time when the public look forward, with anxious expectation, to this Board, in a matter of so much importance, not only to the navigation of the Firth of Forth, but in general, to the eastern coast of Great Britain.

Having finished a design and model of a pillar-formed light-house for the Bell Rock, immediately after the very fatal storm which occurred in the month of December 1799, the next object of the Reporter, was to survey the rock itself, that he might judge more fully of its fitness for the situation. Accordingly, in the month of April following, he set off for the rock, and had reached Fifeness, when, from the state of the weather, he was obliged to return, after an absence of ten days, without accomplishing his purpose. Soon after his return from his annual voyage to the Northern Light-houses, Mr Gray, secretary for the Commissioners, requested of the Board of Customs to grant the use of one of its yachts, to make another attempt. An order having been accordingly obtained for the Osnaburgh cutter, Captain Campbell, then lying at the Elie, the reporter, accompanied by his friend Mr James Haldane, architect, set off for that place. But the Osnaburgh being then under repair, and the period of spring-tides being at hand, it was found advisable to proceed along the coast to West-haven, on the northern side of the Firth of Tay; and upon Sunday the 5th of October 1800, a landing was effected upon the Rock, and an ample opportunity afforded of gaining all necessary information.

The Bell Rock, as appears by the best charts of the coast, is situated at the mouth of the Firth of Forth, in west longitude 2° 22´, and north latitude 56° 29´. It lies nearly fifteen miles from the Island of May, in a north-eastern direction per compass, and twelve miles south-west from the Red-head in Angusshire, which it resembles, being a free-stone of a reddish colour, though of a much harder body, and closer grit. Besides its natural asperities, the surface in general is thickly coated with sea-weed, and, on the higher parts, the barnacle, white buckie or whelk, and limpets, abound, and altogether it presents a very rugged appearance, owing to the sloping of the strata from south, where highest, to north, at an angle of about 30 degrees. The material part of the rock, which lies north-east and south-west, measures, on an average, about 300 feet in length, and 240 feet in breadth. The highest part above the surface of the sea, does not exceed seven feet at low-water of spring-tides; which part, at high-water of same tides, is from nine to ten feet under water. The reporter also found, that the medium height of the foundation of any building erected upon it, will not exceed two or three feet above the surface of the sea at low-water of spring-tides. The above dimensions may be termed the material part of the rock; but, south-west of this, there runs a reef or shoal, of considerable extent, which is only visible in very low tides.

The short time which the Bell Rock is seen above water, and the irregularity of the soundings in its vicinity, are the cause of many wrecks upon it. Indeed, after the water has flowed, in ordinary tides, but a very short time, the most skilful mariner cannot point out its place, without its proper meaths or land-marks in sight, which lie from twelve to twenty miles distant. Under these circumstances, the Bell Rock will be found more dangerous to vessels coming near it, than perhaps any of those reefs upon which Light-houses have as yet been erected.

The Edystone Rock, for example, is about eleven miles from land, situate at the entrance of Plymouth Sound. Before the rock was reduced for the foundation of the Light-house, it was about three feet above high-water of spring-tides. The Longships Rock, situate three miles off the Lands-End, is about forty feet above high-water mark, though barely large enough for the foundation of the Light-house. The Smalls lie fourteen miles off St David’s Head; and the rock on which the light-house is built, is about five feet above high-water of spring-tides. The South Rock, lying three miles off the land, between Loch Strangford and Donaghadee, is about four feet under the surface at high-water of spring-tides. The Tour de Corduan, upon the coast of France, is built upon a sunken rock at the entrance of the Garonne, and is said to be about eight feet under the surface of the sea at high-water of spring-tides. And, lastly, the Bell Rock, the subject of this report, lying upwards of eleven miles from land, is from nine to ten feet under water, as before stated.

Ever since the reporter had an opportunity to know the danger and inconvenience that must attend the navigation of the Firth of Forth, while the Bell Rock remains without some signal upon it, to forewarn seamen, he has been much employed in considering what kind of building would be most applicable to its situation; and he has, therefore, endeavoured to obtain as much information as possible about works of this kind. The first light-house erected upon an insulated rock on the coast of Great Britain or Ireland, appears to have been that of the Edystone, which was begun in 1696, and was scarcely finished, when a dreadful storm carried it completely away. This erection was constructed of timber, and was designed and executed by Mr William Winstanly, who, with his artificers and the light-keepers, unfortunately perished in its ruins. The next light-house that was built upon the Edystone Rocks, consisting partly of stone and partly of wood, it was finished in 1709, and was the work of Mr John Rudyard, who, carefully avoiding the errors of his predecessor, lopped off all superfluous ornaments, and produced a plain building; which, after withstanding the fury of the waves for forty-nine years, had the misfortune to be destroyed by fire. The present Edystone Light-house was begun in 1756, and finished in 1759. It has now stood forty-four years, a memorial of the ingenuity and indefatigable labours of Mr John Smeaton, who, guarding against the defects of the two former buildings, constructed the whole of stone; the blocks of the solid part are curiously dove-tailed into each other; and every thing unnecessarily tending to give resistance to the water is carefully avoided, while the whole is completely fire-proof. The next light-house erected upon a situation of this kind, was the Smalls, which is placed upon eight beams of oak, arranged round a centre one. The latest light-house built on an insulated situation, is that upon the South Rock on the coast of Ireland. The reporter made three successive journeys to this light-house, during its progress: First in 1796, when it was only 12 feet in height; again in 1797, when it was nearly finished; and a third time in the month of August 1800. This light-house is built of granite, quarried in the mountains of Morne. The method of dove-tailing or joggling the stones, and attaching the courses to each other, is different from that of the Edystone; throughout the solid part of the masonry, and eighteen inches within the circumference of the building, six great bars of malleable iron are carried up, each four inches square; and upon the top of every alternate course, a circular plate of iron is let into the stone, and fixed by spear-bolts to the upright bars. The building is of a conical figure, and was built in the course of three years from a design by Mr John Rodgers of Dublin.

Before being properly certified as to the possibility of getting a foundation for a building of any kind upon the Bell Rock, the reporter thought of a Floating-light, like those moored off the Dudgeon-shoal, and other sand-banks on the coast of England. But the foulness of the ground about the Bell Rock, the great depth of water near it, together with the unsteadiness of a light of this description,—and above all, the perplexing uncertainty which must ever attend such a light in a storm, cannot fail to unhinge the confidence of the mariner, and thereby prevent him from making free with his course; and when, from an error in it, or in the distance run, he is disappointed in seeing the light, wrong conclusions are apt to be formed: he supposes that the Floating-light has drifted, and by changing his course, perhaps turns upon the very point of danger. These were considerations from which much relief was felt, upon learning that the rock was large enough to form the foundation of a permanent building; but, till the moment he landed upon it, he was uncertain if a building of stone was applicable; and foreseeing the difficulties which would be avoided, if, instead of carrying up the lower part solid, it could be formed of pillars, after the manner of the Smalls Light-house; reflecting also upon that elegant and useful application lately made of cast-iron, in the construction of bridges, choice was made of this metal, in his first model for the Bell Rock, as being more substantial than timber, and also less liable to corrosion from the action of the atmosphere than malleable-iron. This light-house (see Plate VII.), was to consist of six hollow tubes or pillars, built each to the height of ninety feet, measuring two feet in diameter at the base, and diminishing to six inches at the top, ranged round a common centre so as to form a diameter of thirty-five feet at the base, and eight feet at the top, immediately under the light-room. The pillars were to be cast in lengths or pieces of ten feet each; and at every joint horizontal bars were made to grasp the pillars, and the whole was also connected diagonally with various cross braces. Under the light-room, the building was to be laid out into four heights of apartments for the light-keepers and stores, formed within the range of the pillars, which occupying 45 feet of their height, the part below being of similar height, was left free for the passage of the sea, thus presenting the least possible resistance to the waves. These apartments were to be formed and covered in with strong copper, which, to prevent its acting upon the iron, was to be coated with tin. The lower part, or floor nearest to the sea, was to form an inverted cone, presenting a surface calculated to disperse the seas which might strike against it. In order still more to increase the common base, and strengthen this fabric, Professor Robison advised that a diagonal bar should be attached to the exterior side of each of the pillars.

In this first design, provision was made chiefly against the impulse of the sea, without taking into account the possibility of a vessel or wreck getting near it; but he found, after landing upon the rock, that it was possible for a vessel at high-water to come, without interruption, against the pillars. To guard against misfortune from this quarter, the reporter first thought of defending the pillars in various ways, particularly by throwing a kind of Chevaux de Frise round them, with beams of oak. He, however, found it difficult to suppose any set of pillars of adequate strength to resist the force of a loaded vessel, violently agitated in a winter storm, which must render the pillar-formed construction very uncertain, even after every precaution should be taken to guard against such accidents. Nor ought the danger to which such a mass of metal, constantly exposed to the effects of the marine-acid, to be wholly overlooked, in giving a preference to a circular building of stone, which being a compact figure of solid matter, would resist any force that might be brought against it. The reporter has estimated the Pillar-formed Light-house at L.15,000; and, although that for the Tower of masonry amounts to L.42,636, 8s., yet, as it is treading a beaten path, which leads to certainty, it is surely to be preferred in a work of this kind: the foundation-course of stone must be more tedious than that of so many pillars, yet, in this there is nothing impracticable; and when the difficulties of the first courses are surmounted, the superiority of a fabric of stone over one of iron will readily be admitted.

In the model for a building of stone, made since the reporter first landed upon the Bell Rock, he has retained nearly the same elevation as that of the Edystone Light-house, which presents less resistance, and preserves a greater base than perhaps any other figure that could have been thought of. In this design he has also followed Mr Smeaton in the use of oak-trenails to keep the stones in their places, while the work is in progress; but has differed in the mode of diminishing the interior-walls, as the building rises in height. Instead, also, of Mr Smeaton’s plan of dove-tailing the stones, and connecting the floors, various other modes are resorted to, for effecting this perpendicularly as well as laterally, with the view of introducing larger materials, and keeping the stones in a more entire state. One of these is by an iron-bat, which is inserted into the joints of the lower courses, while the void or upper courses are to be indented, or let perpendicularly into one another. Upon inspection of the models and drawings of this design, it will perhaps be found to render the construction more simple, to divide the strength of the walls more equally, and, upon the whole, to give that stability which the situation of the Bell Rock seems so peculiarly to require. (See Plate VII.)

Upon comparing the pillar-formed Light-house, with the circular tower of masonry, it is matter of surprise that ever the Smalls Light-house should have been erected upon that plan, unless it were to avoid the additional expence of a stone building. There is, however, one circumstance which materially favours the pillar-formed construction at the Smalls, the want of which becomes a principal objection to its application at the Bell Rock; namely, that the Smalls Rock being five feet above high-water of spring-tides, the pillars are more obviously defended from injury in the event of a vessel or wreck coming against them, and also from the violence of the sea, whereas the Bell Rock, at certain periods of the tide, is from nine to ten feet under water.

When Mr John Rennie, civil engineer, obligingly favoured the reporter by examining his models, he gave a decided preference to the structure of stone, as did Professors Robison and Playfair. And Captain Huddart also, upon seeing the pillar-formed model, mentioned that the Trinity-House did not approve of iron pillars which, in the instance of the Smalls, were considered not so proper as beams of oak. The chief motives which induced the reporter to model a light-house upon the plan of the Smalls, were the uncertainty of procuring a foundation for a stone building; the small resistance which the pillars present to the force of the waves, and the first cost being very considerably less. But although this is true, with regard to the resistance, it must also be remembered, that the pillars come prodigiously short of the weight of a tower of masonry, of the dimensions of the one modelled, containing upwards of 2000 tons; whereas the iron pillars, even in their most improved state, do not exceed 200 tons. When, therefore, the stone light-house is compared with the iron one, all idea of the greater resistance of the former is lost in its solid contents, and in the uniformity of its figure.

In alluding to the great utility of an erection on the Bell Rock, it may, in general, be observed, that it is in the same degree of latitude with the Town of Holstebro in Denmark, and that the Naze of Norway, or entrance to the Baltic, lies north of Holstebro 1° 30´. It therefore follows, that all vessels bound to the Baltic, from, any port south of the River Tweed, must cross the latitude of the Bell Rock, while the degree of east or west longitude, in which such vessels pass, must depend upon the direction of the winds and other circumstances. In order to avoid the enemy in the time of war, it is common for shipping in this track, first to make the land about Buchanness in Aberdeenshire, and from thence take their departure either over seas, or along shore to their respective ports. With regard to ships bound for Archangel and Greenland, they, at all times, make the Islands of Shetland, and from thence take their departure. If, therefore, lines be drawn from Buchanness and Girdleness in Aberdeenshire, to Flamborough Head in Yorkshire, and the mouth of the Tyne in Northumberland, the Bell Rock will only be found to lie from six to ten leagues distant from these courses or lines. So that vessels crossing the mouth of the Firth of Forth, from Buchanness to the Humber and Thames, &c., may not only come in sight of a light upon this rock, but be materially benefited by it, according to the state of the weather, while those upon the course of the nearest line bound for Newcastle and Sunderland, &c. must, in every voyage which carries them north of the Tweed, be essentially served by a light upon the Bell Rock.

It further deserves notice in this place, that the principal estuaries on the eastern coast of Great Britain, are those of the Friths of Moray and Forth, and the Rivers Humber, and Thames. The most material general purpose which would be answered by a Light upon the Bell Rock, is the opening of the Firth of Forth as a place of safety, in storms from south-east, east, and north-east. When mariners at sea are overtaken with a gale under such circumstances, they make for the most contiguous of these four inlets; but are often known to avoid the Forth, on account of this Rock, which, like another Cerberus, guards its entrance. Of this, a melancholy example occurred (which will long be remembered with that regret which never fails to accompany the forlorn case of the widow and fatherless), in that heavy gale at south-east, which happened in the winter of 1799, and drove many vessels from their moorings in Yarmouth Roads, put them past the Humber, and the crews being afraid to make free with the Firth of Forth, even though the wind was fair, were, with others, driven ashore between the Redhead in Forfarshire, and Kinnaird Head in Aberdeenshire, to the number of about thirty sail. Nor were they all saved that weathered Kinnaird Head; several were wrecked in Orkney and Shetland; and the whole loss occasioned by this gale has been stated as high as seventy sail, with many of their crews! amongst which are reckoned two that were known to have been lost upon the Bell Rock. This fatal catastrophe, of which the history of our coast affords few examples, is the more to be lamented, when it is considered that a light upon the Bell Rock, by opening the way to a place of safety, would infallibly have been the means of preventing much calamity, to those who sought safety, with various fortune, in more northern latitudes. In conclusion, it may be observed, that until this improvement of the coast comes from the Commissioners of the Northern Light-houses, it is much to be feared that the cause continuing, the sad effects will not cease.

(Signed) Robert Stevenson.

To the Honourable the Commissioners of the Northern Light-houses.

REPORT by Mr Rennie.

Gentlemen,

In consequence of your directions, I set out in a vessel called the Pharos, from Leith, on the 15th of August last, early in the morning, in company with Robert Hamilton, Esq. one of your Commissioners, and Mr Stevenson, your Engineer, to view the Bell or Cape Rock, for the purpose of considering the practicability of building a Light-house thereon. But, owing to the want of wind, we did not get near the Rock till dusk, i. e. about half-past seven, which was near half ebb; but although we were not above a mile distant, we could discover but little of the rock itself. Its situation, however, was sufficiently apparent, by the breakers upon it, which, although the sea was very little agitated where we were, yet the waves were very high on the Rock itself, breaking over it with considerable violence. We approached within less than half a mile of it, and took soundings; but it becoming dark, we judged it advisable to sail further off, and anchored about a mile from the Rock all the night, in expectation we should be able to land on it next morning, which, from the serene appearance of the sky, we doubted not we should be able to effect. We had not dropped the anchor long, when the little wind there was during the day ceased, and it became a dead calm, but, notwithstanding this, there was a heavy swell, and the vessel rolled much. Frequently, during the night, I viewed the place where the Rock lies, and saw the heavy breakers which played about it, till near three quarters flood, when they nearly ceased, and no appearance of such a place was to be observed. They commenced again about quarter ebb, and continued increasing for some time; but, by nine in the morning, the sea became more smooth, and about half-past nine, the rock appearing several feet above water, we left the Pharos in a small boat, and had the satisfaction of landing on it about half-past ten, a little before low water. The spring-tides, however, were rather past their height, being five days after the full moon. We landed on the north-east side of the Rock, in a little bay or inlet, through some breakers, but these were just on the verge of the Rock, for when we got in, the water was quite smooth.

The Rock lies in a direction nearly south-west and north-east, magnetic bearing. That part which was dry, saving some small inlets, I found to be about 280 feet long, and 220 feet wide. Its general surface was about 4 feet above the level of low water, though some places were about 6 feet high. The Rock, however, extends for some distance all round that part which was dry, and dips downward. It extends under the surface for about 400 feet on the south-west side, about 100 feet on the north-east side, and about 50 on the south-east and north-west sides; and on those parts the water is shallow. At about 300 feet south-west, I found about 13 feet water, but, on account of the breakers, could not sound on the low parts of the Rock, or either of the other sides. At the extremities of the main Rock above mentioned, the dip is sudden; the bottom, however, is rocky for a considerable extent round its bed, but the water is deep.

The Rock itself is a hard red freestone, in beds dipping to the south-east, about one in five; these beds are various in their thickness, some being much greater than others; but, generally, well connected together. Such parts as are not immediately exposed to the violent wash of the waves, are coated with a hard crust, and covered with limpets; and, indeed, when it is exposed to the full fury of the sea, there seems to be little appearance of decay, so that I have no doubt, were a Light-house constructed here, no fears need be entertained for the durability of the Rock, as it seems to me well calculated to resist the effects of the waves.

We remained on the Rock for about an hour and a half, when the tide began to flow rather quickly, and having got all the necessary measurements as to height and size, we left it, and returned to our vessel, having been much gratified with the ample view we had of it, and soon after our getting on board the vessel, we weighed anchor at one, and the wind suiting, we arrived at Arbroath about four o’clock.

The Inch Cape, or Bell Rock, lies in West longitude 2° 22´; North latitude 56° 29´, as stated by Mr Stevenson. It is about eleven miles distant from the harbour of Arbroath, about ten miles from the Bluff Point of the Sands of Barry, at the northern side of the entrance to the River Tay, and about eleven miles from the Red Head, which lies between Arbroath and Montrose; so that in fact it is about the same distance from the shore as the Edystone Rock, on which Mr Smeaton completed a stone light-house in the year 1759. The soundings on the south-west side, and near to this Rock, as taken at low water, were about 7 fathoms, within half a mile of it; and, in the same direction, about 15 fathoms, bottom rock. About three-fourths of a mile, 19 to 20 fathoms, bottom gravel. At the north-east side, and near to the Rock, the soundings were 6 fathoms. About three-fourths of a mile north-west of the Rock 15 fathoms, and about a mile and a quarter in the same direction 18 fathoms. We did not take the soundings on any other side of the Rock, or at a greater distance; but I was informed they were full as much as those we had taken.

Such being the situation of the Cape or Bell Rock, lying nearly in the direction which vessels generally take in sailing into the Firth of Forth, from northerly directions, or out of it, in sailing to the north or east, it is no wonder that many accidents should arise in hazy weather or dark nights, there being no means of discovering its situation correctly, unless when the land-marks are to be seen, for the deep water lying so close all round the Rock, nothing can be ascertained from soundings, until too near to enable vessels to get out of the way. Breakers, no doubt, frequently point out its situation, but these, in dark nights, and hazy weather, often are not sufficient, and at high-water, even in good nights, are not always discernible; for want of other means, many vessels have been wrecked thereon, and numberless valuable lives and much property lost.

Vessels trading from the Humber, and northwards to the Baltic, to Norway, Greenland, &c. are often, by stress of weather, driven towards the coast, and even those from more southerly ports often share the unfortunate fate of coasting vessels. It is therefore of the utmost importance that something should be done to mark out the situation of this dangerous and frightful Rock.

A Beacon has been proposed, but this would but ill answer the purpose. Nothing, in my opinion, would do it effectually, except a Light-house; and the question is, whether a Light-house could be built on this Rock, and, if so, of what materials it should be composed, and which, in point of strength and durability, are most likely to become a lasting work, without which the mariner can never make free with his course.

Of all the works which could be erected here, perhaps a wooden Light-house would be the cheapest. But were a wooden Light-house to be constructed, I apprehend a solid base of stone must first be constructed, similar to that built on the Edystone by Mr Rudyard; but wood is liable to decay; it would require constant repairs, and would also be liable to be destroyed by fire, as that of Mr Rudyard’s was. A Light-house of cast-iron might also be constructed here, and I will allow that it might have a coating of lead, or other metallic substance, so as for a long time at least to resist the effects of the marine acid. But to make a Light-house that would last of such materials, would be nearly, if not wholly, as expensive as one of stone, which I believe, I need scarcely say, no human ingenuity could render as durable; and as the durability of such a work as this is of the utmost consequence, I apprehend a moderate sum of extra expence ought not to be looked on as an object of material consideration, when put in competition with the advantages of durability. But, besides these objections to a work constructed of wood or iron, vessels being apt to be driven against it at high-water, there being at spring-tides from nine to ten feet deep on the top of the Rock, and should the vessel be a large one, and acted on by a heavy sea, it would not be difficult to foretell the consequences.

The durability and efficacy of a stone Light-house has been proved in the most satisfactory manner at the Tour de Corduan, near the mouth of the River Garonne, on the coast of France; at the Edystone, off the mouth of Plymouth Harbour, and in other situations. Why, therefore, with such incontestible proofs before our eyes, should recourse be had to a material new in itself for such purposes, and untried? a material which, if fitted and joined together as it ought to be, would consume nearly as much time in getting the lower part laid, as the laying of three or four courses at the bottom of a stone Light-house, and when the stone-work is got to the height of five or six feet above the Rock, the greatest part of the difficulty may be said to be over; and besides, such a solid mass of materials would resist any violent shock of a vessel which might be brought against it by the sea. I have, therefore, no hesitation in giving a decided opinion in favour of a stone Light-house.

As to the practicability of erecting such a work on the Bell Rock, I think no doubt can be entertained, with such examples before us as the Tour de Corduan and Edystone before mentioned.—In the 4th volume of the Architecture Hydraulique of Belider, an account is given of the Tour de Corduan. It is built on a low rocky island, dry at low water, and whose surface is nearly level; it is covered at high-water, as near as I can ascertain from his draughts and description, about 8 or 9 feet. It is exposed to a very heavy swell of the sea, lying quite open to the Bay of Biscay, from whence it is well known very heavy swells come, and beat against it with great fury; yet this Light-house has resisted the fury of the waves for above 250 years.

The Edystone Light-house is built even in a more exposed situation than that of the Tour de Corduan, and upon a rock whose surface is little larger than the base of the Light-house itself. The top of this rock is shelving, and was seldom covered by ordinary spring-tides before Mr Smeaton began his foundation; the lower part, however, was always covered over at the top of neap-tides. At the lowest place, when he began his work, the rock was dry about six hours each tide, although there the Edystone Rock is less in size than the Cape Rock, yet the advantage of being so long dry, is greatly in favour of building a Light-house; the most difficult and tedious part of the work being the establishment of the four or five lower courses of the foundation.

The higher parts of the Cape Rock, as I have before stated, are little more than six feet above the low water of an ordinary spring-tide. But I apprehend, when a place sufficiently large for the foundation is levelled, its surface will be little more than three and a half feet above the low water of an ordinary spring-tide. I do not think that above three hours’ time for work can be expected, which is about half of what was got at the Edystone. The depth of the water all round it, and its exposure to the German Ocean, renders it as difficult a situation to construct a durable work upon as that of the Edystone, if not more so. I doubt, therefore, more time will be required for the work; but this depends so much on the state of the weather, that no certain calculation can be made. It is better, therefore, to reckon on a sufficient time, and this I would beg leave to state at four years; and if it can be done in less time so much the better. The Rock upon which the Edystone Light-house stands is certainly harder than the Cape Rock, and of course required more time to work; but, on the other hand, the Cape Rock lying in a more northerly latitude, and where the weather is more variable, it is likely that greater interruption will be given to the proceedings than in the other; so that, all circumstances considered, the time I have mentioned, I doubt, will be little enough.

Mr Stevenson, to whose merit I am happy to bear ample testimony, has been indefatigable in obtaining information respecting this Rock, and he has made a model of a stone Light-house, nearly resembling that of the Edystone, in which he has proposed various ingenious methods of constructing the work, by way of facilitating the operations. I own, however, after considering these in the fullest manner I have been able, and comparing them with the construction of Mr Smeaton’s, I mean in the building, and also that there is undoubted proofs of the stability of the Edystone, I am inclined to give it the preference. No doubt some methods different from the Edystone will require to be put in practice for the foundation; but its general construction, in my opinion, renders it as strong as can well be conceived,—in fact, it may be looked upon as a solid mass of rock. Viewing the matter, therefore, in this light, it will be unnecessary for me to accompany this Report with the design of a Light-house. It will be time enough to make such a design, when the Commissioners shall be in a situation to give orders for the erection, and then I have no doubt Mr Stevenson will furnish much valuable matter towards the perfecting of it.

The total height of the Edystone Light-house, from the lower course of stones on the rock to the top of the platform or balcony-floor, is about 70 feet; from thence to the bottom of the iron-frame of the lantern about 6 feet 9 inches; and the lantern itself is about 8 feet 3 inches; so that the total height to the eve of the cupola is about 84 feet 6 inches. Now, as the Bell Rock lies so much lower than that of the Edystone, I think the height of the shaft or tower of the Light-house should not be less than 80 feet, or, perhaps, a little more, say 85 feet; so that the cupola will, in this case, be about 100 feet above the surface of the rock. With such a height of Light-house as is here proposed, I would advise that the diameter of the base should be greater, and as it is less surrounded by such an extent of rock, it will give facility to the gradual diminution of the effects of the waves breaking upon it; will render the fabric more steady, and, as it will diminish quickly, no great additional surface will be presented to the sea.

The floor of the lower room, i. e. the height of the solid part of the Light-house, I would propose to be about 50 feet, and from thence to the top of the platform 35 feet, making a total height, from the rock to the platform or gallery, of 85 feet. As to the lantern itself, I need say little on that head, as lanterns for light-houses have, of late years, been greatly improved, as well as the lights. The substitution of lamps with reflectors, in place of coal or candle lights, has been found of the greatest advantage to the mariner; and it is not unlikely, from what I have been lately made acquainted with, that the substitution of the hydrogen gas in place of lamps, will not only prove a much cheaper, but a better light than even lamps. I am told that it will not cost above one-eighth of the price of oil. The kind of light to be used is also a matter of consideration, for unless lights are so constructed as to enable the mariner to distinguish between one and another, he may be apt to mistake his situation; but that also can be easily arranged, when this part of the subject comes to require consideration. The new light on the Skerries in Orkney is a revolving one; perhaps a similar one may also be judged advisable here, as, if the Light-house on the Island of May was to be fitted up with reflectors in the usual manner, it would not always be easy to distinguish this from the Cape Rock, unless one of them was to be made a revolving, or the lights to be placed in different situations of the house.

A Light-house has, of late years, been built on the South Rock, near the mouth of Loch Strangford, on the coast of Ireland. This Light-house was begun on the 11th of June 1795, and completed the 25th March 1797. It is 30 feet diameter at the base, and about 15½ feet just below the balcony floor. It is 56 feet high from the rock to the platform or balcony floor, and its shape is the frustum of a cone. It is built of granite from the Mountains of Morne; and the lantern, from the platform to the cupola, is about 12 feet high, and 10 feet wide. The light is a revolving one, and lighted by 10 lamps with reflectors, 3 in the upper course, 3 in the lower course, and 4 in the middle, and makes a revolution in five minutes. This distinguishes it from the Copland lights.

The rock on which this Light-house stands is about 400 yards long, and about 100 wide, and is covered about 18 inches deep at high-water, ordinary spring-tides. The rock is composed of beds of schistus, intermixed with beds of a kind of indurated clay, which are wearing fast away by the washing of the sea; and, unless some speedy and effectual means are taken to secure it, this Light-house will not be of long duration. It has cost about L.22,000, and it is said that L.7000 more will be required to secure the rock from washing away. I will not take upon me to say that this sum will be sufficient for the purpose; but it seems to me that it will not be a very difficult matter to secure the rock, if proper means are taken. The channel is here narrow, and the seas cannot be very heavy; indeed Macculloch the Light-house keeper informed me, that they seldom rise above the first landing, which is only about 27 feet from the top of the rock.

In the construction of a Light-house at the Cape Rock, great care will be necessary in choosing stone of the most durable quality, fit to resist the effects of the waves. For this purpose, I examined the rocks lying along the shore nearest adjoining the Inch Cape Rock, but found none of a very durable quality; most of it is a red freestone, softer than the rock itself, which has been much worn away by the wash of the sea, and therefore by no means fit for the exterior work of such a building; and there does not appear to be any fit for that purpose nearer than Kingoodie, about three or four miles from Dundee. This stone is a hard millstone-grit, of an excellent quality; very hard to work, but can be raised in blocks of any size and thickness required. It therefore appears to me to be most fit for the exterior work of a Light-house to be built on the Cape Rock; but as the price the proprietor asks for it is very high, it becomes a question whether the solid part of the building may not be done with the stone from near Arbroath, which, although not fit for exterior work, is yet of a pretty strong quality, and might be used in the solid part of the building, not exposed to the weather or wash of the sea: Or, it may be a question, whether the saving that would arise from using the stone near Arbroath, is a consideration, when put in competition with the superior strength and specific gravity of the Kingoodie stone.

Granite is also a stone that will resist the waves without wearing, and it is therefore a matter of consideration, whether granite stone might not be had from Peterhead or Aberdeen for this purpose. Granite, it is true, cannot conveniently be had in such large blocks as the Kingoodie stone, but it may be had in blocks sufficiently large to answer the purpose, and, if well dove-tailed, and properly cemented together, the whole may be made to act as one solid body of rock.

As to the expence of a Light-house in such a situation, it is not a very easy matter to form any thing like a correct calculation. So much depends on weather, on the untoward circumstances that may probably happen while the work is in hand, that they baffle even the most experienced artist to make the proper allowances. The price and quantity of materials is by no means difficult to ascertain; but the expence of putting them together must be more a matter of guess than of correct and well founded calculation. I have, however, computed the expence that such a work ought to cost, and have made every allowance for contingencies, from my own experience of works in the sea, and from what I have been able to collect from the experience of others, in which, I think, I have made a very full allowance for contingencies, and the cost amounts, by my estimate, to L.41,844, but I will say L.42,000, and, I trust, if ever the work is executed, and done with judgment, it will not exceed that sum.

I have gone on the supposition, that the outside is to be made of Kingoodie stone, and the hearting of stone from near Arbroath. I am, Gentlemen, your most humble servant,

(Signed) John Rennie.

To the Honourable the Commissioners of the Northern Light-houses.

REPORT by Mr Stevenson.

In the year 1800, when the Reporter laid before the Commissioners various models of a Light-house for the Bell Rock, the prospect of the undertaking was so distant, that it then appeared unnecessary to trouble the Board with any scheme for carrying the work into execution; but since the passing of the act of Parliament for this purpose, the case is materially altered. In preparing any method for carrying on a work, the most difficult in its nature, and one to which the common tests of experience can hardly be applied, he is aware, that it is impossible, by any previous arrangement, to determine what will answer in all respects. In so far as the operations on shore are considered, the ordinary rules of practice apply, but, in forming plans for the Rock itself, matters must be adjusted to the situation and circumstances of the case.

Certain measures, of a preliminary nature, are, however, indispensably necessary, while others may be of doubtful application; among the former, it appears to be essentially necessary to provide a vessel to be moored at the distance of from three quarters to one mile north-west of the Rock. She must, of course, be fitted up as a store-ship, with accommodation for the artificers, and ground-tackle for riding in from 17 to 20 fathoms water, on rather a hard bottom. This vessel, besides answering as a store-ship for water and provisions, may occasionally take on board lime, cement, and other materials from the small craft at the Rock, when lying at anchor with them on board may be found inconvenient. There is also another and most important service, which this vessel will fall to perform in terms of the act of Parliament, which is the carrying of a Light upon her mast, for the benefit of shipping, and to enable a duty to be collected, even before the commencement of the work, agreeably to the suggestion of Mr Cuningham.

The Reporter, in order to inform himself more fully regarding the construction of such a vessel, while attending the progress of the Bill in London, visited the Floating-light ship at the Nore, under the command of Mr Bennet, who very politely described every particular connected with the business. He had also frequent communications with Captain Huddart of the Trinity House, who takes a particular charge of the Floating-lights under the management of that Board, since which he has also corresponded with him upon the subject, who has obligingly stated his ideas relative to a vessel and moorings fitted for the Bell Rock. Upon the whole, the Reporter is of opinion, that a dogger, or Dutch-built vessel, is best calculated for this service. Such a vessel would require to be from 80 to 100 tons burden, moored with a mushroom-anchor, weighty iron mooring-irons, having likewise on board a hempen cable of 16 inches in circumference. The mushroom-anchor, which is but a late invention, is now in use at all the Floating-lights on the coast, and even in some of his Majesty’s store-ships. Its great property consists in its being hardly possible for a vessel to foul her anchor with it; and the construction is such, that it may be made in part, or wholly, of cast-iron, agreeably to the accompanying model, from which an idea may more easily be formed of its application. (See Plate X.). This vessel must be furnished with such a light as to be readily distinguishable from the Coal-light on the Island of May; and although the Dudgeon Floating-light, off the Norfolk coast, which carries two lanterns, is at a great distance, yet, as it is the nearest Floating-light to the Bell Rock, it may be advisable to distinguish it from that also. As a vessel cannot be dispensed with for the accommodation of the artificers, it will be found to be a great saving to employ her as a store-ship. As this vessel is only meant to answer a temporary purpose, by purchasing one of the Dutch or Prussian prize-ships, now for sale in Leith, she might perhaps be fitted up for about L.2000.

Although it would be perfectly impossible to do any thing with much effect at the Bell Rock, without a vessel stationed in the offing; yet as she must necessarily be moored at the distance of about a mile from it, to give a sufficient birth for swinging, according to the wind, and also to give sea-room to clear the Rock, in the event of her breaking adrift, the inconveniency and difficulty of the frequent passage between the Floating-light and the Rock must be very considerable. It therefore occurs to the Reporter, that the greatest advantages would arise from the erection of a temporary residence for the artificers upon the Rock during the working-months of summer, and also to answer as a store for some of the materials. The greatest difficulties which Mr Smeaton had to struggle with at the Edystone, arose from the smallness of the rock, which at once precluded any attempt of this kind from being undertaken, and subjected the work to all the disadvantages and trouble so particularly described as experienced in communicating on all occasions with the store-ship. But, from the extent of the Bell Rock, an opportunity may be had for erecting a temporary residence, for facilitating the work. It was under the conviction that such an accommodation might be constructed, that the clause was introduced into the act for allowing the collection of half-duties upon the erection of a Beacon. But, independently of these advantages, the Reporter conceives some erection of this kind necessary, to give confidence to the artificers, in the event of accident to the boats, of which they might lay hold, until assistance could be procured from the store-vessel. This temporary residence is provided for in his estimate for the Light-house, and having modelled it, he proposes that it should consist of beams of timber, not less than 50 feet in length, and of proportional strength; the beams are coupled together at the top, where they form a cabin for the workmen, and, at the same time, answer all the purposes of a Beacon.

The next material object to be considered, is a method which may prolong or extend the working hours at the Rock, especially in the first instance, to low water of neap, as well as spring tides. In this respect we also find, that Mr Smeaton had no alternative, having had barely extent for the foundation of the Light-house; but, in this respect, he had less occasion for such an apparatus, as the top of the Edystone Rock was rather above high-water, although, from its shelving form, the level of the ground-course was not more than nine feet above low water of spring-tides. The ground-course of the Bell Rock, however, will not be more than about two feet above low-water of such tides. It therefore becomes an object of great importance, to construct a water-tight fence round the site of the building, which might be the means of saving a whole season with the work, and securing the proper execution of the lower courses, by enabling the workmen to go on in a more deliberate manner with their operations. The Reporter has had several methods in view for raising a coffer-dam for this purpose to the height of about six feet or thereby, which would allow the work to proceed regularly in moderate weather at low water of neap as well as spring-tides. He has, accordingly, modelled a coffer-dam with this view, which he proposes to be three feet more in diameter than the base of the building, and, from its exposed situation, the greatest attention must be paid to the strength and fitness of the materials. At first he intended this to be of timber, but at length fixed upon cast-iron, strongly connected with iron-bolts, passing through flanges raised upon the joints, which are to be provided with a groove, for the conveniency of tightening them. The whole of this apparatus is estimated to weigh about 40 tons, and is so constructed, that when all the pieces are landed on the rock, and laid in their places, the foundation for them being prepared, they may be set up, and temporarily fixed, in the course of a good spring-tide.

There is no part of this critical work which will be attended with so much difficulty as the landing of heavy materials, nor is there any part of the business that has occupied so much of the Reporter’s attention. Mr Smeaton appears to have had a great deal of trouble upon this head; and in conversing with one of those having charge at the South Rock Light-house, on the coast of Downshire in Ireland, while it was building, it was stated, that there was more time lost in getting a regular supply of materials, and more vexation attending this department, than any other part of the operations, although this rock is exposed and dry at every tide, and only 3 miles from the shore, with a beach where vessels were laid to discharge their cargoes; whereas the Bell Rock is about 11 miles from land, forming neither a steep-face, like that of the Edystone, nor a sloping beach, like that of the South Rock, while it is so low in the water, that it can afford little or no shelter to vessels, if brought alongside of it. Under all these adverse circumstances, the landing of the materials becomes a consideration of the most perplexing nature. He has sometimes thought that the depth of water upon the rock might be turned to advantage in landing the stones at high-water; yet this mode has its disadvantages, and could not always be depended upon; others must, therefore, be resorted to, more certain in their application. Vessels of an easy draught of water, and not exceeding 20 tons burden, might in very moderate weather be brought close into some of the small creeks of the rock. Some of these will admit of improvement, where cranes might be fixed for unloading them. This may, perhaps, turn out to be the surest mode upon trial; but it may also be necessary to resort to others, such as having buoys moored in different directions, at a convenient distance from the rock; by making fast a hawser to the buoy best suited to the direction of the wind; the hawser may be veered out till the vessel with the materials gets so close to the Rock as to discharge. Some have even supposed, that the materials may be transported to the Rock under these circumstances by a float of cork or timber, and when the vessel is thus cleared of her cargo, she may be hauled off again, and so make sail. The stones, when landed, if not immediately built, may be stowed into the cast-iron coffer-dam, which, for this purpose, will be found of the greatest use, while the lower courses of the building are in progress; and as the work advances, other plans will present themselves.


In the Report dated 23d December 1800, on the subject of the Bell Rock, the Reporter explained his reasons for laying aside the plan of a cast-iron Light-house, and, after what has since been stated in Mr Rennie’s report 30th December 1805, it is unnecessary for him to enter again upon that subject, especially as it has been fixed that the building is to be of stone. The matter which he, therefore, now submits to the consideration of the Board, is, the quarry or quarries from which these materials should be taken. It is to be regretted, that the extensive quarries in the neighbourhood of Arbroath are not of so durable a nature as to render them fit for outside work. On his way from Fraserburgh lately, he passed through Aberdeen, Arbroath, and Dundee, and, in addition to former inquiries, brought with him a note of prices, and specimens of the stone of the quarries of these places. Upon the whole, there seems to be objection to the use of best Arbroath or Red Head stone, for the hearting or inside-work, which may be had for 9s. 4d. per ton. The Mylnefield or Dundee stone at 25s., but for the granite, of the sizes wanted, no price could be quoted. Stone is the principal material that requires consideration. As for lime, we have an extensive choice in this country, and nothing can perhaps answer the purpose better for securing the outside joints than Parker’s cement. The Reporter has a specimen of Aberthaw lime, which Mr Smeaton used with so much advantage; it would be no difficult matter to get a cargo of it, which would be sufficient for the whole building.


With regard to the Lantern, and other parts of the building which require to be of metal, without entering into particulars, they will no doubt fall to be made of copper, at least such parts as are more particularly exposed to the action of the air or water. As to the nature of the Light itself, there may be some improvements and alterations upon the present system, before the building is completed; but, after erecting such a fabric as will be necessary at the Bell Rock, no pains will of course be spared upon so essential a part as the quality or description of Light to be exhibited.


Supposing the work to commence in the Spring of the year 1807, it is already time that the store-vessel were in preparation, and the necessary arrangements made for fitting her up as a Floating-light, that the collection of the duties may commence; and, when got to her moorings, the workmen may begin to the temporary residence or beacon, and prepare the rock for the building, which would form the primary operations, and occupy the first Summer. If the beams are found to withstand the storms of winter, the upper part can then be covered in as a residence for the artificers in 1808; and, at all events, be habitable for the Summer of 1809. While these measures are carrying forward, and the site of the building is in progress, the lower course of stones will be in preparation on shore. The place which the Reporter would propose for carrying on these works is Arbroath, as the port most contiguous to the Rock, being situate at the northern side of that range of coast which forms St Andrew’s Bay, in which the Bell Rock holds a centrical situation. A passage may be made from Arbroath to the Rock with much more regularity than from the Tay. On the southern side of this great Bay, there is no convenient harbour between the Tay and Fifeness. The stones, being transported from Mylnefield and Aberdeen, would be hewn at Arbroath, and after being laid and marked upon a platform, course by course, would then be shipped for the Rock.


It is unnecessary at this time to enter further into particulars. When the dimensions of the building are finally arranged, it will then be proper to enter into contracts for the materials, and shipping for conveying them, and to provide implements and artificers for the work.

(Signed) Robert Stevenson.

To the Honourable the Commissioners of the Northern Light-houses.

JOINT REPORT by John Rennie and Robert Stevenson.

Gentlemen,

You having at your meeting on the 10th instant resolved that the Light-house to be erected on the Bell Rock shall be of stone, we, according to your request, went to Aberdeen and Mylnefield, for the purpose of examining into the quality and price at which stone for the erection of the Light-house could be delivered at Arbroath, the place where it is proposed the materials shall be prepared for the work.

At Aberdeen, we found that many additional quarries had lately been opened, some of them of an excellent quality, and capable of producing larger blocks of stone than granite quarries usually do; but still it is doubtful, as has been formerly mentioned, whether any one quarry will be found to produce a sufficiency of large blocks in any reasonable time; but by purchasing from different quarries, a regular supply may be procured for all the purposes wanted, in case you shall determine upon using the granite in preference to stones from Kingoodie. The Aberdeen granite is of so very strong and durable a nature, and has been used in works where the sea has acted upon it for time immemorial, that no doubt can possibly be entertained respecting its adaptation to a work of this kind. There is also every reason to believe, that the Kingoodie stone resists the sea and weather equally well, but we have not been able to collect such positive proofs of this as of the other; for, although a good deal of that stone has been used in the piers of the harbour of Dundee, yet, as this has been mixed with other sorts of the same appearance, and nearly of the same composition of those of Kingoodie, it prevents the possibility of our saying whether some of the stones that have wasted may not be Kingoodie, although we have great reason to believe that they are not. However, where facts cannot be positively ascertained, doubts exist; and we think, that a Light-house upon the Bell Rock is too important a work to suffer even a doubt to exist; and we have no hesitation, therefore, in recommending, that the under part of the building, at least as high as the first apartment, should be of Aberdeen granite; and as this is the great bulk of the work, it may be as well, perhaps, to complete the outer course of granite to the top.

As to the extra price this will incur, we cannot at present correctly say. We have had two offers for granite from the Rubislaw and Dancing-Cairn Quarries. The former by Robert Spalding, is at 10d. per cubic foot, delivered on the quay at Aberdeen, but, as the expence of shipping and shore-dues are not included, this may be fairly reckoned at 2d. per cubic foot more. The other is from Snell, Ranie and Thom, at 1s. 4d. per cubic foot, delivered free on board a vessel at the quay. Now, as the freight from Aberdeen to Arbroath will be about 7d. per cubic foot, and as an agent must be employed to examine and see the stone delivered by the different quarry-men, we suppose that 1d. per foot may be added for commission; so that, exclusive of Government duties, the offer for Aberdeen stones will stand nearly as follows: Spalding’s offer, with charges, will amount to 1s. 8d. per cubic foot, and Snell and Company’s at 2s. The expence of working the Aberdeen stone will come high, we doubt, for such a work as this. Where dove-tails, and other devices for the security of the building will be necessary, it cannot cost less than 2s. 6d. per cubic foot. Now, taking the price of stone at the average of the above offers, it will amount, with workmanship and freights, to 4s. 4d. per cubic foot, so that the casing or outside course of granite will amount to about L.7266. Mr Mylne offers to supply blocks of Dundee or Kingoodie stone, put free on ship-board, at 1s. per cubic foot; the freight from thence to Arbroath will be about 4d. per cubic foot, so that the stone will cost at Arbroath 1s. 4d. The working of this stone will cost about 1s. 6d. per foot, making the cost of the Kingoodie stone 2s. 10d.; therefore a casing of Dundee stone would amount to L.4760, making a difference in favour of Kingoodie stone of L.2506.

The next question that arises here is, what kind of stone should be used for the hearting of the building, where nothing can affect the stone, of whatever quality it may be; and here the Arbroath or Redhead quarries may come into competition. There are arguments in favour of both; the Kingoodie will be more expensive, but its specific gravity is greater, and it is of a much stronger nature than the Arbroath stone. If Kingoodie stone is used for the hearting, the cost of the stone, with freight and cutting, will be about L.2124. The Arbroath stone will cost, delivered at the work, about 9s. per ton of 16 cubic feet, and cutting about 1s. per cubic foot, so that the total cost will be about L.1172, a difference in favour of the Arbroath stone, besides duty, of about L.952. Now, whether you may agree to pay this extra price we will not venture to anticipate, but we have no hesitation in saying that the Kingoodie stone is the best.

Another object which occupied our attention, was the procuring of a piece of ground at Arbroath, with proper sheds and warehouses, near the harbour, for the purpose of dressing the stones, laying the courses as they are to be in the Light-house, keeping stores, &c. &c. For this purpose we applied to Messrs Duncan and Cargill, who have a ship-builder’s yard adjoining the harbour, and who some time since intimated their intention of disposing of it; but we found that the place was not of the dimensions necessary for the work, that the warehouses on the ground did not belong to the ship-yard, and that the people had not finally determined upon disposing of this place. We therefore inquired further, and found a piece of ground much larger than the carpenter’s yard, and nearly as well situated, but there are no buildings upon it; and indeed, there is no other spot at all convenient, or near the harbour, that can be had. We therefore saw the proprietor John Taylor, and he has offered to let the whole for seven years, at the rent of Twenty Guineas per annum. The rent is high, but the situation is such as to render it more suitable than any other, and therefore we advise Mr Taylor’s proposal to be accepted.

Having now stated the result of the several objects for which our journey northward was undertaken, it may be proper to mention what occurs to us as the best mode of proceeding respecting the measures to be taken for the erection of the Light-house, with the construction that appears best suited to the stability of the work. The first object that naturally presents itself is the establishment of the Floating-Light, now in preparation, respecting which some correspondence has taken place between Mr Stevenson and Captain Huddert of the Trinity Board of London, which is now before you. Their information is very satisfactory, and from the measures taken in advising with the Trinity-House of Leith, it is hoped that every thing relative to the fitting out of the Prussian-dogger, purchased for this service, will be the most complete of the kind, and the sooner she can be got to her moorings the better, that the operations at the Rock may be commenced, and that the duties may be collected for paying the Treasury loan, and otherwise adding to the general fund.

The second object that comes under consideration is the inclosing the piece of ground at Arbroath for a work-yard. This may either be done by a ruble wall or a wooden fence, but the former is preferable, because several buildings must be made for stores, and for floors, to mark out the different courses with the dove-tails as they form the building, so that the ruble wall may form part of these buildings. Sheds must also be erected for the masons to work in.

Thirdly, Two vessels, of about 30 tons each, for conveying stones from Arbroath to the Rock, should, without delay, be contracted for. These vessels must be built strong, and of good materials, and calculated to work well at sea, that no opportunity of going to the Rock may be lost.

Fourthly, A crane for unloading the vessels should be established at Arbroath, and another at the Rock, for landing the materials, as also the necessary tools and triangles, with tackle for setting the stones in the work-yard, and at the Rock likewise, stone-carriages, jacks, &c.

Fifthly, Mooring-chains, anchors, buoys, with ropes, &c., to assist in landing the materials, and for enabling the men to leave the Rock when the tide prevents them from working.

Sixthly, A coffer-dam will be wanted, to the height of 4 or 5 feet, so as to enable the workmen to continue so much longer on the Rock than they could do, were the tide allowed to flow over the foundation when it rises above the level of the Rock.

Seventhly, Although we do not pretend to say that a stage, for the accommodation of the workmen, can with certainty be constructed on the Rock, yet it might be worth while to attempt the establishment of such a work, as, if it did answer, great facility in carrying forward the work would be obtained; and, should the project fail, the timber and iron can be applied to other uses, and the expence of the experiment cannot be great.

Eighthly, A variety of small tools, for cutting the foundation of the Rock, for dove-tailing the stones, and sundry other uses too tedious to mention, will also be wanted.

Ninthly, A quantity of Aberthaw lime should be procured, as well as other lime of the best quality which the country affords, and a small lime-kiln for burning it erected, and no more burned at once than can be used in a short time, that it may be always had as fresh as possible, as the less it is exposed to the air after being burned the better will it cement. Pozzolano or tarras should be got, if possible, to mix with the lime, these making the best cement that has yet been discovered; but, if it cannot be had, manganese, or even burnt ironstone, will form a good substitute. A quantity of Parker and Company’s Roman cement will be wanted, to keep the sea from washing out the other cement before it has time to harden in the joints.

Tenthly, Oak trenails will be required for fixing down the stones, while the building is in operation, and the several courses liable to be washed by the waves. Lead for running bolts into the Rock, &c. will also be necessary.

As to the construction of the Light-house itself, we are of opinion, that it is much better to follow what has been found to answer at the Edystone, a situation nearly similar to the present, than, in a work so important, to look for other methods that have not stood the test of trial. It must, however, be observed, that some alteration, suited to the difference of local circumstances, ought to be adopted. The Rock at the Edystone differs both in form and quality from the Bell Rock; it lies in a slanting direction, and the higher part was never covered by the tide. It is of a harder quality, and but small in size; nothing, therefore, was to be found in this case in regard to the wearing or wasting of the Rock; and from its limited size, there was no more space than what merely enabled the engineer to make the erection upon it.

The case at the Bell Rock is very different, the Rock being, on an average, not more than four feet higher than low-water of spring-tides. It is of a softer quality, but the dimensions are large. It therefore becomes necessary that the base should be more extended and flat where it is connected with the Rock, so that when the waves break upon it, they may spend their fury on the base of the Light-house, instead of the Rock itself, and thereby prevent it from wearing away. The tower should also be higher, as the tide rises more upon it than on the Edystone. These, and a few other alterations, will adapt the Edystone plan to the Bell Rock, unless in so far as the light itself is connected; but this need not now be a subject of inquiry. A Plan of the Light-house, nearly similar to what is proposed, is handed herewith, but no plan of the dove-tailing has been made, nor can it well be done at present, as the dove-tails must be suited to the different courses of stone as they come from the quarry; but, as the principle is similar to that of the Edystone, the design may be easily judged of.

It is of much importance, that, in so hazardous a work as the present, recourse should speedily be had to advice when occasion requires; and, as a Quorum at all times cannot be got, it might be advisable to appoint a Sub-Committee of your number, to be called together when necessity may require.

(Signed) John Rennie.
Robert Stevenson.

To the Honourable the Commissioners of the Northern Light-houses.

REPORT by Mr Rennie.

Gentlemen,

I went to the Bell Rock on the 5th instant, when I found Mr Stevenson with his workmen engaged in preparing the Rock to receive the foundation of the Light-house; also in erecting a Beacon on it, for the double purpose of pointing out to mariners the situation of the Rock more correctly than can be done by the Floating-Light, and as an asylum to the men employed on the Rock, in case they should be overtaken by the tide before the boats had time to take them to the vessel. Mr Stevenson had been constantly engaged in the different operations for about two months, during which time he had never been ashore; and it was fortunate he had taken the resolution of remaining constantly on board, for, without this, there is every reason to believe that the workmen could not have been prevailed on to continue at the work, they having previously shewn a disposition to leave it; but by perseverance, and by allowing them their provisions while on board the vessel and working at the Rock, they have not only been prevailed on to remain at the work, but they now seem to be better satisfied when at the Rock than on shore; and as no accident has happened, although the weather has several times been very stormy, there is great reason to believe that the workmen, being now accustomed to the work, and having gained entire confidence by the success of the past year, will return with redoubled vigour next season, and that the work will proceed with much spirit and regularity.

The work performed in the course of the present season, consists first of preparing the Rock for the foundation of the Light-house to a certain extent; but owing to that part of the Rock where the Light-house is to stand being very uneven in the surface, and some of it within 2½ feet of the level of the sea at low-water of spring-tides, the time at which the men can work is of course very limited; and as there would be great danger of shivering the Rock, if blasting or any other violent measure were resorted to for expediting the work, it has been thought better to proceed in the more secure mode of cutting the stone by picks and chisels, which, as the Rock is hard, and so consumes much time, considerable progress has been made towards this; and I hope, by the end of next June, the whole of the Rock will be completely ready to receive the foundation-course of the Light-house: perhaps it may even be ready sooner; but so much depends on weather, I do not venture to state particularly the time when this most essential object will be completed; but I have great confidence in the zeal Mr Stevenson has shewn in the past season, to prognosticate that he will do all that can be done in the next to expedite the work.

A large beacon, consisting of six main beams of timber, about 13 inches square, and 44 feet long, has been erected on the Rock; it forms a pyramid of about 42 feet high, and a base of the same extent. This is well secured to the Rock with dove-tail cramps, and with chains and braces. Near the top are cross-bars to stiffen the upper part of it, which have been found of great use, as the smith’s forge for sharping tools was erected there, and for the last fortnight the tools were sharped, and various other works done, which tended greatly to facilitate the operations at the Rock. The workmen continued there during the time the Rock was covered with the tide, which enabled them to begin working the moment the part was uncovered where they were employed, and it likewise enabled them to work till the last moment, when the tide began to cover the work. Had no such asylum been provided, the workmen would not only have lost much time in getting from the vessel to the Rock, but also in getting from it. This beacon is not yet entirely finished: a few good tides would enable the workmen to complete it, and when done, I have great hopes it will be found to resist the storms; indeed it has resisted several even in the unfinished state it is, and therefore is a favourable prognostication that it would be stable when completed.

There is, besides, a provision-chest intended to be placed on its top, and above this a ball and flag-staff, so that I hope it will be a very useful additional mark for mariners to avoid this dangerous Rock, and should be advertised as well as the Floating-Light.

The advanced state of the year renders it necessary that the operations at the Rock should stand until the spring of the year. This is proposed to be done whenever the beacon is completed; but during the winter every requisite measure should be taken to proceed with the work for the Rock as expeditiously as possible. For this purpose I must beg leave to recommend to the Commissioners that the remainder of the articles mentioned in our Report of the 26th December last, should be provided with as little delay as possible.

The ground taken on lease from John Taylor, at Arbroath, for a wood-yard, has been covered in part with the necessary buildings and workshops, but sheds for the masons to work in during the winter season are not yet done. These may be got of the most temporary kind; if they just keep off the rain it will be enough, and no delay should take place in procuring them.

Several cargoes of Aberdeen and Dundee stones have been laid down and landed at the yard, part of which are worked, and the masons are engaged in working the remainder. I am sorry, however, to say, that neither the supply from Aberdeen nor Kingoodie has been so abundant as could be wished. Unless exertions far greater than has hitherto appeared be made, it will be impossible to proceed with the building on the Rock next season. I accompanied Mr Stevenson both to Aberdeen and Kingoodie. In viewing the former, it appears, that unless stones are purchased from such quarries near Aberdeen, as may turn them out, it is scarcely probable a sufficient quantity of large stones for the lower courses of the Light-House can be had in due time from the Rubieslaw quarries alone. It therefore will be advisable, that Mr Skene empower his agent to purchase from the other quarries whenever blocks of the requisite size can be found. As to the Kingoodie quarry, it only wants a little exertion on the part of Colonel Mylne’s agents, as the quantity wanted would be easily got in a few weeks, if exertion such as has been promised be made.

The Floating-Light was completed and moored within the distance of one mile from the Rock on the 9th July, and for some time the people employed at the Rock lodged in her; but the situation in which she was moored has been found not to answer, as, after the gale of the 6th September last, which she rode out with perfect safety, it was found that her cable had been cut by a piece of rock or wreck. She went adrift next day, luckily without receiving any injury, but it has been found that there is no clear ground, (at least that has yet been discovered), less than the distance of about two miles and a half from the Rock, which will render her of no use as a place to accommodate the workmen; another vessel of some sort must therefore be provided. The Yacht has been used since the Float was removed to such a distance, but as neither the manner she was rigged, nor her accommodation, is suitable, nor indeed can she well be spared from attending the other light-houses, she cannot be counted upon in future. In my opinion a proper vessel should be purchased, and fitted up for this purpose, and she will sell at little discount after the work is completed.

One vessel of the description mentioned in the second article of the Report of 26th December 1806, has been built and fitted out. She has been engaged in carrying materials to the Rock; in carrying stones to the yard; and sundry other matters. A second vessel of the like description should be got ready against the spring, to carry the stones and materials to the Rock, &c. Two cranes have been purchased for loading and unloading stones; one has been erected at Aberdeen, and the other at Arbroath; and they both answer the purpose very well. Triangles, and other necessary apparatus are preparing for the work on the Rock, and will be ready against the time they are wanted. Mooring-chains and buoys for the vessels employed about the Rock have also been prepared and laid down.

It was proposed, in the Report of December last, to have a coffer-dam on the Rock, for keeping out the water during a part of the time the tide is flowing; but it rises so quickly here, after having turned, that I do not think a coffer-dam will produce advantages adequate to the expence. It is therefore proposed to do the work without any coffer-dam at all: there has been sufficient trial already made, to satisfy us respecting its practicability without a coffer-dam. The beacon already erected, and which there is reason to believe will stand, renders a stage of the description formerly mentioned unnecessary. It is intended, should this beacon stand over the winter, to erect places for the accommodation of the workmen employed at the Rock on its top. This will greatly facilitate the operations, as before stated.

Most of the small tools mentioned in article 9th of Report of December last, have been procured. Some are still wanting; but these are few. No Aberthaw lime has been procured, nor any pozzolano. Mr Stevenson intends to send the Yacht for a cargo of Aberthaw limestone, as soon as she can be spared from the service of the Light-houses; and, if a vessel is purchased for the accommodation of the workmen at the Rock, she may also be sent for a cargo of Aberthaw lime. I have not been able to procure any pozzolano, although many trials have been made. I have some hopes that a small quantity may still be procured; but I cannot speak with certainty: if not, tarras, or burnt ironstone, must be used. No oak trenails for the stones have yet been got. Mr Stevenson, however, is about to order some from Southampton; and I hope they will be in time for the work. Lead is, at this time, very cheap. I submit it to the wisdom of the Commissioners, whether it might not be advisable to purchase now what may be wanted for the work.

As to the construction of the Light-house, I submitted a plan to your consideration in the month of February last, (see Plate VII.) According to this plan, the works are proceeding; plans of each course of stone have been made; the whole is dove-tailed, but somewhat different from the mode pursued at the Edystone; they are less in length on the outside, but deeper in the direction of the radius of the Light-house, which will render the structure, on the whole, stronger than the Edystone plan. The extension of the base of the building is also much greater; and the base is considerably different. By this means, not only the impulse of the waves on the building will be less, but their action on the part of the rock adjoining the foundation will be much easier. The Rock is softer than that on which the Edystone is built, but it is harder than I imagined when last here. On the whole, I feel confident, that this work will be brought to a successful termination, within a reasonable period. The knowledge which has been acquired by the operations of the last season, impresses me with additional confidence in the practicability of the work, although confident, from the commencement, that, with proper care and attention, such a work might, with certainty, be completed.

The necessity of Mr Stevenson’s remaining much at the Rock while the operations are going forward, render it necessary that some person, by way of agent, should be appointed to pay money at Arbroath, and to credit and settle accounts. As to this the Commissioners will order as they think right. I am, honourable gentlemen, your most obedient servant,

(Signed) JOHN RENNIE.

To the Honourable the Commissioners of the Northern Light-houses.

REPORT by Mr RENNIE.

Gentlemen,

I visited the Bell Rock on the 25th ult. The weather was favourable, but the tide did not ebb so low as to allow me to examine the foundation of the masonry so completely as I could have wished; but as there was little swell, I was enabled to form a tolerable judgment concerning the perfection with which it is executed, and this, I have the pleasure to say, is very favourable.

The Rock was nearly all cut last season, but several parts in the interior was hollow, and others appearing unsound, they could not be cut out without a serious expence in money, as well as a great loss of time. It was therefore judged preferable to make up these places with stone, and, accordingly, 17 stones have been let into different parts of the foundation, which brought the whole on which the Tower stands to a level; on which level, the first course of 12 inches was laid in August, and the outer-edge margin of this course, was nicely fitted all round to the rock, which, in every place except one, as I have been told by Mr Stevenson, projects higher than the upper part of it, by which, the base may be said to be completely indented into the Rock. Above this 12 inch course, two others, of 18 inches, have been laid, and it gives me great satisfaction to inform you, that they are done in a very complete manner, and the mortar, in all the outside joints, has not been at all affected by the sea beating upon it. A very small quantity was out of some of the inside joints, which, I am told, had arisen from the sea catching it (the weather being unfavourable) while the course was laying; this has been directed to be made up, and covered with Roman cement, which will render it as perfect as if no such thing had happened.

It is here proper to remark, that although the pozzolano mortar forms the best of all cements I have seen, yet it does not acquire a sufficient degree of induration to resist the effect of heavy waves for several weeks after it is used. The Roman, or Parker’s cement, acquires almost an immediate induration, capable of resisting the heavy waves; but it never acquires so great a degree of induration, nor does it bind the stones so well together as the pozzolano mortar ultimately does. Its use, therefore, is to guard or preserve the pozzolano mortar until it has time to harden, which it does most effectually, and therefore every joint should be plastered over with this cement as soon as laid.

The place where the lower or 12 inch course is above the Rock, should be made up with stone of the same quality as the Rock itself. These stones should be dove-tailed into the rock, and laid with pozzolano mortar, secured by the Roman cement, the same as the other; for if done with harder stone (should the rock waste at all) it would resist the waves better than the soft, and occasion a more speedy waste of the other parts of the Rock than the Tower. All the protuberances of the Rock round the base of the Tower, should likewise be cut off, and smoothed, so as to form a regular curve at the base of the Tower, by this means there will be no place for the waves to catch, and their action will be regular on the whole, and I have no doubt, when so done, there will be little or no wasting in the rock itself.

The operations in the work-yard seem to be proceeding with much regularity, and there is a good stock of materials now there. Two courses are nearly completed on the platform, and as the diameter of the Tower diminishes fast, I have little doubt that there will be several other courses ready by the season that the work can with safety be resumed on the Rock; so that if the next season is at all favourable, I would fain hope the whole solid part of the Tower may be completed; every course of stone will raise it so much above the rock, and, of course, prolong the time of working a tide, until it is above the top of the springs, and then, if materials can be landed at the rock in sufficient quantity, the laying of them on the Tower will proceed with little or no interruption.

To secure a regular supply, another Praam or Stone-lighter should be got ready by the end of April next. Mr Stevenson has already received proposals for the building of one, and the sooner it is set about the better. It will also be necessary to build or hire another vessel, to assist the Smeaton in carrying out the stones from the work-yard; I apprehend it will be best to hire a vessel for that purpose, as the services required of her will be of short duration. About 10 tons more of pozzolano will probably be wanted, and this I have been able to procure through the friendship of the Hull Dock Company; it is already ground, and now lying there to be shipped. A small additional quantity of Aberthaw limestone is likewise to be procured, by the kelp-vessels that trade to Bristol, as a return freight.

It happens, rather unfortunately, that some of the granite quarries about Aberdeen have veins of a soft sort, which I have reason to believe decomposes with the sea and weather. Some of these stones have, unluckily, been sent to the work-yard. My decided opinion is, that all of this kind should be laid aside for the out-side work, and others of a good quality procured in their place. They can be substituted for the Dundee stone, and, therefore, although some loss will by this means be sustained, it will, on the whole, be trivial. I am, Gentlemen, your most humble servant,

(Signed) JOHN RENNIE.

To the Honourable the Commissioners of the Northern Light-houses.

No. V.
REMARKS relative to the Ground-swells of the Sea.

Wasting Effects of the Ocean.

In the Memoirs of the Wernerian Natural History Society, Vol. III. p. 814., and in the Edinburgh Philosophical Journal, Vol. III. p. 42., the subject of the Wasting Effects of the Sea upon the firm ground, is variously treated by the writer; and is here alluded to, in reference to the production of the appearance termed a Ground-swell, so often observed on our shores. In these papers it has been assumed, that the German Ocean, or North Sea, bounded partly by the coasts of Great Britain, Norway, Denmark, Germany, Holland, and France, as will be seen from Plate III., is almost every where wasting and extending its margin, upon the principle of its forming the great receptacle for all the debris of the surrounding countries above mentioned, which have a direct tendency to lessen its capacity for containing the waters which flow into it from the Atlantic, by the apertures between the shores of Scotland and Norway, towards the north, and between Dover and Calais, to the south. These passages may respectively be conceived as admitting a constant quantity, while this great basin is continually receiving the debris of the extensive tracts of country which surround it, through the medium of the innumerable rivers and streams that fall into it.

Wasting Effects of the Ocean.

Upon similar principles, the extensive lakes of interior countries become so many receptacles for the debris of their respective districts; and must in the lapse of time, contain less water, in proportion to the cubical contents of solid matters carried into them. So it is upon the great scale with the basin of the North Sea, from the extensive banks deposited therein, which lessen its capacity, and thereby give a tendency to the water which flows into it to overflow and waste its margin, producing, under various modifications, those heavy swells in the Sea to which we now allude. With this state of things in view, we may now inquire into the effects of the storms which agitate the waters of the Atlantic, and reach our shores only in the form of what has been significantly termed a Ground-swell; which may partly be illustrated from the storm described in page 312. of this work. We accordingly find the waters of the North Sea often in an agitated state, without any apparent cause, though no doubt proceeding from distant storms at sea. Hence, a continued gale from the westward, passing along the Atlantic Ocean, overcharges all the seas and inlets communicating immediately with it. Under these circumstances, although the surface of the North Sea be comparatively smooth, yet having acquired motion to a considerable depth from the distant storm, it continues to produce the effect of a Ground-swell for a considerable period. A swell of this description is almost constantly observable in the Bay of Biscay, owing to its exposure to the Atlantic, and from the configuration of the bounding land between Cape Finesterre in Spain, Ushant in France, and the relative position of the British Isles. Here the Ground-swells, proceeding from the same cause as those of the North Sea, are either the precursors of a gale of wind, or the effects of one which does not reach us.

Similar, though less evident effects, are produced by gales of wind which may be conceived to be confined to the boundary of the North Sea itself. Hence the heavy waves which often break upon the eastern shores of Great Britain, without any apparent cause at the time, are afterwards found to arise from storms at sea. But the heaviest Ground-swells of the North Sea are produced by gales from the north-east, which proceed in a progressive manner along the inclined plane of its bed, until the waves, by impinging upon the bottom and sides of the firm ground, are so disturbed that they ultimately cease, after wasting the whole extent of the shores, and sometimes causing the most destructive effects upon the coast of Holland, forming the southern extremity of this great basin.

No. VI.

Materials.

SCHEDULE, containing an Enumeration of the MATERIALS used in the Erection of the Bell Rock Light-House.

Course. Granite in Pieces. Sandstone in Pieces. Granite in cubic feet. Sandstone in cubic feet. Tons of Sandstone and Granite. Sandstone Joggles. Oak Trenails. Oak Wedges in pairs. Pozzolano in Barrels. Lime in Barrels. Sand in Barrels.
1 4 14 6 146 10.891 1.5 2.2 1.1
2 52 71 508 876 101.648 13 246 378 13.6 19.9 10.7
3 52 84 808 1269 152.797 13 246 437 16.9 24.8 13.3
4 52 71 696 1009 125.609 13 246 400 14.5 21.2 11.4
5 53 54 593 849 106.258 13 212 336 12.5 18.3 9.8
6 26 71 492 790 94.275 13 194 270 11.8 17.2 9.2
7 26 58 238 767 73.094 13 168 242 8.3 12.3 6.6
8 26 45 196 547 54.148 13 142 268 7.4 11.0 5.8
9 26 45 264 426 50.737 13 142 229 6.3 9.3 5.0
10 26 45 292 606 65.748 13 142 229 7.6 11.0 5.9
11 26 45 339 363 52.006 13 142 229 6.3 9.3 5.0
12 16 37 160 462 45.308 8 108 184 5.7 8.4 4.5
13 16 37 194 347 39.709 8 108 184 5.0 7.4 3.9
14 16 37 168 329 36.423 8 108 184 4.8 7.0 3.7
15 16 37 188 301 35.962 8 108 184 4.6 6.8 3.6
16 16 37 153 321 34.698 8 108 184 4.7 6.9 3.7
17 16 37 182 308 36.000 8 103 184 4.7 6.9 3.7
18 16 37 153 297 32.983 8 108 184 4.4 6.4 3.4
19 16 37 180 304 35.560 8 108 184 4.5 6.6 3.5
20 16 29 196 308 37.077 8 108 152 4.3 6.3 3.4
21 16 29 211 264 35.088 8 92 152 4.2 6.1 3.2
22 16 29 100 311 29.906 8 92 152 3.9 5.7 3.0
23 16 29 177 238 30.615 8 92 152 3.9 5.7 3.0
24 16 29 147 303 32.951 8 92 152 3.9 5.6 3.0
25 16 29 149 235 28.248 8 92 152 3.5 5.2 2.8
26 6 39 142 250 28.780 8 92 152 3.5 5.2 2.8
27 38 315 22.500 8 79 67 3.0 4.4 2.4
28 33 259 18.500 8 66 58 2.8 4.1 2.2
29 26 236 16.857 8 54 61 2.9 4.2 2.2
30 26 249 17.786 8 52 54 2.4 3.4 1.8
31 25 238 17.000 8 50 68 2.2 3.3 1.8
32 26 274 19.571 8 52 69 2.3 3.3 1.8
33 28 302 21.571 8 56 78 2.6 3.8 2.0
34 30 296 21.143 8 60 80 2.7 4.0 2.1
35 32 271 19.357 8 64 80 3.0 4.5 2.4
36 32 266 19.000 8 64 80 2.5 3.7 2.0
37 32 279 19.929 8 64 80 2.3 3.5 1.8
38 24 275 19.643 1.5 2.2 2.0
39 16 138 9.857 1.2 1.8 1.6
40 16 136 9.714 1.2 1.7 1.5
41 14 133 9.500 1.1 1.6 1.4
42 14 142 10.143 1.1 1.6 1.4
Over, 599 1524 6932 16035 1678.590 338 4065 6329 207.1 303.8 165.4

Key:
A Course.
B Granite in Pieces.
C Sandstone in Pieces.
D Granite in cubic feet.
E Sandstone in cubic feet.
F Tons of Sandstone and Granite.
G Sandstone Joggles.
H Oak Trenails.
I Oak Wedges in pairs.
J Pozzolano in Barrels.
K Lime in Barrels.
L Sand in Barrels.

A B C D E F G H I J K L
1 4 14 6 146 10.891 1.5 2.2 1.1
2 52 71 508 876 101.648 13 246 378 13.6 19.9 10.7
3 52 84 808 1269 152.797 13 246 437 16.9 24.8 13.3
4 52 71 696 1009 125.609 13 246 400 14.5 21.2 11.4
5 53 54 593 849 106.258 13 212 336 12.5 18.3 9.8
6 26 71 492 790 94.275 13 194 270 11.8 17.2 9.2
7 26 58 238 767 73.094 13 168 242 8.3 12.3 6.6
8 26 45 196 547 54.148 13 142 268 7.4 11.0 5.8
9 26 45 264 426 50.737 13 142 229 6.3 9.3 5.0
10 26 45 292 606 65.748 13 142 229 7.6 11.0 5.9
11 26 45 339 363 52.006 13 142 229 6.3 9.3 5.0
12 16 37 160 462 45.308 8 108 184 5.7 8.4 4.5
13 16 37 194 347 39.709 8 108 184 5.0 7.4 3.9
14 16 37 168 329 36.423 8 108 184 4.8 7.0 3.7
15 16 37 188 301 35.962 8 108 184 4.6 6.8 3.6
16 16 37 153 321 34.698 8 108 184 4.7 6.9 3.7
17 16 37 182 308 36.000 8 103 184 4.7 6.9 3.7
18 16 37 153 297 32.983 8 108 184 4.4 6.4 3.4
19 16 37 180 304 35.560 8 108 184 4.5 6.6 3.5
20 16 29 196 308 37.077 8 108 152 4.3 6.3 3.4
21 16 29 211 264 35.088 8 92 152 4.2 6.1 3.2
22 16 29 100 311 29.906 8 92 152 3.9 5.7 3.0
23 16 29 177 238 30.615 8 92 152 3.9 5.7 3.0
24 16 29 147 303 32.951 8 92 152 3.9 5.6 3.0
25 16 29 149 235 28.248 8 92 152 3.5 5.2 2.8
26 6 39 142 250 28.780 8 92 152 3.5 5.2 2.8
27 38 315 22.500 8 79 67 3.0 4.4 2.4
28 33 259 18.500 8 66 58 2.8 4.1 2.2
29 26 236 16.857 8 54 61 2.9 4.2 2.2
30 26 249 17.786 8 52 54 2.4 3.4 1.8
31 25 238 17.000 8 50 68 2.2 3.3 1.8
32 26 274 19.571 8 52 69 2.3 3.3 1.8
33 28 302 21.571 8 56 78 2.6 3.8 2.0
34 30 296 21.143 8 60 80 2.7 4.0 2.1
35 32 271 19.357 8 64 80 3.0 4.5 2.4
36 32 266 19.000 8 64 80 2.5 3.7 2.0
37 32 279 19.929 8 64 80 2.3 3.5 1.8
38 24 275 19.643 1.5 2.2 2.0
39 16 138 9.857 1.2 1.8 1.6
40 16 136 9.714 1.2 1.7 1.5
41 14 133 9.500 1.1 1.6 1.4
42 14 142 10.143 1.1 1.6 1.4
Over, 599 1524 6932 16035 1678.590 338 4065 6329 207.1 303.8 165.4

Course. Granite in Pieces. Sandstone in Pieces. Granite in cubic feet. Sandstone in cubic feet. Tons of Sandstone and Granite. Sandstone Joggles. Oak Trenails. Oak Wedges in pairs. Pozzolano in Barrels. Lime in Barrels. Sand in Barrels.
Over, 599 1524 6932 16035 1678.590 338 4065 6329 207.1 303.8 165.4
43 16 140 10.000 1.1 1.6 1.4
44 16 139 9.929 1.2 1.8 1.6
45 16 135 9.643 1.1 1.7 1.4
46 16 132 9.429 1.1 1.6 1.4
47 18 261 18.643 16 64 2.0 3.0 1.5
48 16 118 8.429 1.0 1.5 0.8
49 16 115 8.214 1.0 1.5 0.8
50 14 114 8.143 1.0 1.5 0.8
51 14 123 8.786 0.9 1.4 0.7
52 16 122 8.714 0.9 1.4 0.7
53 16 115 8.214 1.0 1.5 0.8
54 16 113 8.072 1.0 1.5 0.8
55 16 102 7.286 0.9 1.4 0.7
56 18 258 18.428 16 64 2.0 3.1 1.5
57 16 97 6.929 0.9 1.4 0.7
58 16 104 7.429 0.9 1.4 0.7
59 14 96 6.857 0.9 1.4 0.7
60 14 102 7.286 0.7 1.1 0.5
61 16 100 7.143 0.8 1.2 0.6
62 16 97 6.929 0.8 1.3 0.6
63 16 90 6.429 0.7 1.1 0.5
64 16 86 6.143 2.0 3.1 1.5
65 18 228 16.288 16 64 0.6 0.9 0.4
66 16 83 5.929 0.7 1.0 0.5
67 16 82 5.859 0.6 0.9 0.4
68 16 88 6.286 0.4 0.7 0.3
69 12 76 5.429 0.6 0.9 0.4
70 16 74 5.286 0.6 0.9 0.4
71 16 95 6.786 1.0 1.5 0.8
72 16 77 5.500 2.0 3.1 1.5
73 16 75 5.357 2.5 3.7 2.0
74 18 225 16.071 16 64 2.0 3.1 1.5
75 16 73 5.216 0.6 0.8 0.4
76 16 73 5.216 0.7 1.1 0.5
77 16 82 5.859 0.6 0.7 0.4
78 12 62 4.429 0.5 0.7 0.4
79 12 62 4.429 0.6 0.9 0.4
80 12 75 5.357 0.6 0.9 0.4
81 16 70 5.000 1.0 1.5 0.8
82 16 181 12.929 1.0 1.5 0.8
83 16 190 13.571 16 2.0 3.1 1.5
84 16 257 18.357 16 2.0 3.1 1.5
85 16 298 21.286 16 2.5 3.7 2.0
86 8 62 4.429 0.4 0.7 0.3
87 8 60 4.286 0.4 0.6 0.3
88 8 56 4.000 0.3 0.6 0.2
89 8 52 3.716 0.3 0.5 0.2
90 8 48 3.429 0.2 0.5 0.1
Total 90 599 2236 6932 21598 2075.945 450 4065 6585 255.0 377.9 204.5

Key:
A Course.
B Granite in Pieces.
C Sandstone in Pieces.
D Granite in cubic feet.
E Sandstone in cubic feet.
F Tons of Sandstone and Granite.
G Sandstone Joggles.
H Oak Trenails.
I Oak Wedges in pairs.
J Pozzolano in Barrels.
K Lime in Barrels.
L Sand in Barrels.

A B C D E F G H I J K L
Over, 599 1524 6932 16035 1678.590 338 4065 6329 207.1 303.8 165.4
43 16 140 10.000 1.1 1.6 1.4
44 16 139 9.929 1.2 1.8 1.6
45 16 135 9.643 1.1 1.7 1.4
46 16 132 9.429 1.1 1.6 1.4
47 18 261 18.643 16 64 2.0 3.0 1.5
48 16 118 8.429 1.0 1.5 0.8
49 16 115 8.214 1.0 1.5 0.8
50 14 114 8.143 1.0 1.5 0.8
51 14 123 8.786 0.9 1.4 0.7
52 16 122 8.714 0.9 1.4 0.7
53 16 115 8.214 1.0 1.5 0.8
54 16 113 8.072 1.0 1.5 0.8
55 16 102 7.286 0.9 1.4 0.7
56 18 258 18.428 16 64 2.0 3.1 1.5
57 16 97 6.929 0.9 1.4 0.7
58 16 104 7.429 0.9 1.4 0.7
59 14 96 6.857 0.9 1.4 0.7
60 14 102 7.286 0.7 1.1 0.5
61 16 100 7.143 0.8 1.2 0.6
62 16 97 6.929 0.8 1.3 0.6
63 16 90 6.429 0.7 1.1 0.5
64 16 86 6.143 2.0 3.1 1.5
65 18 228 16.288 16 64 0.6 0.9 0.4
66 16 83 5.929 0.7 1.0 0.5
67 16 82 5.859 0.6 0.9 0.4
68 16 88 6.286 0.4 0.7 0.3
69 12 76 5.429 0.6 0.9 0.4
70 16 74 5.286 0.6 0.9 0.4
71 16 95 6.786 1.0 1.5 0.8
72 16 77 5.500 2.0 3.1 1.5
73 16 75 5.357 2.5 3.7 2.0
74 18 225 16.071 16 64 2.0 3.1 1.5
75 16 73 5.216 0.6 0.8 0.4
76 16 73 5.216 0.7 1.1 0.5
77 16 82 5.859 0.6 0.7 0.4
78 12 62 4.429 0.5 0.7 0.4
79 12 62 4.429 0.6 0.9 0.4
80 12 75 5.357 0.6 0.9 0.4
81 16 70 5.000 1.0 1.5 0.8
82 16 181 12.929 1.0 1.5 0.8
83 16 190 13.571 16 2.0 3.1 1.5
84 16 257 18.357 16 2.0 3.1 1.5
85 16 298 21.286 16 2.5 3.7 2.0
86 8 62 4.429 0.4 0.7 0.3
87 8 60 4.286 0.4 0.6 0.3
88 8 56 4.000 0.3 0.6 0.2
89 8 52 3.716 0.3 0.5 0.2
90 8 48 3.429 0.2 0.5 0.1
Total 90 599 2236 6932 21598 2075.945 450 4065 6585 255.0 377.9 204.5
Masonry, 2075.945
Lantern, and its Apparatus, 7.500
Total in Tons, 2083.445

In this Table, 13 cubic feet are allowed to a ton of Granite, and 14 cubic feet to a ton of Sandstone.

Workmanship.

SCHEDULE, shewing the Extent and Description of WORK executed on the Sandstone and Granite employed in the Erection of the Bell Rock Light-house.

Course. Granite Beds and Joints in superficial feet. Sandstone Beds and Joints in sup. feet. Granite face-work in superficial feet. Sandstone face-work. Sandstone polish-work. Granite boring in lineal feet. Sandstone boring in lineal feet. Granite wedge grooves in lin. feet. Sandstone wedge grooves in lin. feet. Granite Lewis holes. Sandstone Lewis holes.
1 500 18
2 1165 3354 132 156 264 208 170 52 71
3 2472 3141 275 208 325 260 421 52 84
4 1832 2980 265 208 325 300 300 52 71
5 1735 2406 220 208 251 300 204 52 54
6 1120 2788 196 104 316 156 349 26 71
7 679 2100 159 69 267 138 185 26 58
8 613 1858 110 78 184 104 164 26 45
9 750 1359 113 82 166 113 125 26 45
10 626 1887 111 87 173 112 145 26 45
11 898 1216 114 91 181 130 156 26 45
12 519 1394 90 51 125 69 120 16 37
13 522 1157 87 51 125 69 120 16 37
14 443 1148 86 51 125 69 120 16 37
15 539 997 84 51 125 69 120 16 37
16 448 1123 82 51 125 69 120 16 37
17 484 1093 80 51 125 69 120 16 37
18 430 1036 79 51 125 69 120 16 37
19 467 1023 84 56 134 74 129 16 37
20 484 952 89 56 110 80 114 16 29
21 513 872 87 56 110 80 114 16 29
22 319 981 82 53 113 76 118 16 29
23 464 829 78 53 113 76 118 16 29
24 361 926 88 59 107 83 111 16 29
25 388 802 77 56 110 80 114 16 29
26 370 818 76 56 110 80 114 6 39
27 1017 70 36 130 78 38
28 943 62 31 99 58 33
29 956 61 31 81 61 26
30 785 61 30 78 54 26
31 754 60 30 75 68 25
32 762 70 35 87 80 26
33 868 73 47 98 97 28
34 908 68 23 100 93 30
35 1022 68 23 106 93 32
36 854 64 21 106 86 32
37 782 71 25 112 100 32
38 502 70 111 24
39 421 56 37 16
40 417 56 37 16
41 391 55 37 14
42 372 60 44 14
Over, 18641 50494 2944 1025 598 2093 5306 2933 4859 594 1528

Key:
A Course.
B Granite Beds and Joints in superficial feet.
C Sandstone Beds and Joints in sup. feet.
D Granite face-work in superficial feet.
E Sandstone face-work.
F Sandstone polish-work.
G Granite boring in lineal feet.
H Sandstone boring in lineal feet.
I Granite wedge grooves in lin. feet.
J Sandstone wedge grooves in lin. feet.
K Granite Lewis holes.
L Sandstone Lewis holes.

A B C D E F G H I J K L
1 500 18
2 1165 3354 132 156 264 208 170 52 71
3 2472 3141 275 208 325 260 421 52 84
4 1832 2980 265 208 325 300 300 52 71
5 1735 2406 220 208 251 300 204 52 54
6 1120 2788 196 104 316 156 349 26 71
7 679 2100 159 69 267 138 185 26 58
8 613 1858 110 78 184 104 164 26 45
9 750 1359 113 82 166 113 125 26 45
10 626 1887 111 87 173 112 145 26 45
11 898 1216 114 91 181 130 156 26 45
12 519 1394 90 51 125 69 120 16 37
13 522 1157 87 51 125 69 120 16 37
14 443 1148 86 51 125 69 120 16 37
15 539 997 84 51 125 69 120 16 37
16 448 1123 82 51 125 69 120 16 37
17 484 1093 80 51 125 69 120 16 37
18 430 1036 79 51 125 69 120 16 37
19 467 1023 84 56 134 74 129 16 37
20 484 952 89 56 110 80 114 16 29
21 513 872 87 56 110 80 114 16 29
22 319 981 82 53 113 76 118 16 29
23 464 829 78 53 113 76 118 16 29
24 361 926 88 59 107 83 111 16 29
25 388 802 77 56 110 80 114 16 29
26 370 818 76 56 110 80 114 6 39
27 1017 70 36 130 78 38
28 943 62 31 99 58 33
29 956 61 31 81 61 26
30 785 61 30 78 54 26
31 754 60 30 75 68 25
32 762 70 35 87 80 26
33 868 73 47 98 97 28
34 908 68 23 100 93 30
35 1022 68 23 106 93 32
36 854 64 21 106 86 32
37 782 71 25 112 100 32
38 502 70 111 24
39 421 56 37 16
40 417 56 37 16
41 391 55 37 14
42 372 60 44 14
Over, 18641 50494 2944 1025 598 2093 5306 2933 4859 594 1528

Course. Granite Beds and Joints in superficial feet. Sandstone Beds and Joints in sup. feet. Granite face-work in superficial feet. Sandstone face-work. Sandstone polish-work. Granite boring in lineal feet. Sandstone boring in lineal feet. Granite wedge grooves in lin. feet. Sandstone wedge grooves in lin. feet. Granite Lewis holes. Sandstone Lewis holes.
Over, 18641 50494 2944 1025 598 2093 5306 2933 4859 594 1528
43 383 60 44 16
44 409 59 40 16
45 395 59 40 16
46 388 58 40 16
47 685 67 231 80 18
48 361 54 38 16
49 352 54 38 16
50 335 54 52 14
51 322 64 44 14
52 315 64 44 16
53 335 58 49 16
54 339 58 41 16
55 318 54 38 16
56 672 65 231 80 18
57 320 51 38 16
58 318 51 38 16
59 301 51 48 14
60 250 60 41 14
61 273 60 41 16
62 298 55 49 16
63 294 51 41 16
64 294 51 41 16
65 645 55 231 80 18
66 277 49 38 16
67 274 49 38 16
68 250 53 57 16
69 192 43 61 12
70 198 43 61 16
71 282 57 44 16
72 259 49 38 16
73 254 49 38 16
74 645 51 247 80 18
75 209 45 45 16
76 247 53 41 16
77 226 57 52 16
78 165 54 61 12
79 221 54 61 12
80 225 52 49 12
81 368 49 38 16
82 679 115 16
83 846 160 16
84 671 148 16
85 165 399 16
86 157 92 8
87 147 91 8
88 138 90 8
89 129 89 8
90 120 88 8
Total 90 18641 66440 2944 3145 4377 2093 5306 2933 5179 594 2240

Key:
A Course.
B Granite Beds and Joints in superficial feet.
C Sandstone Beds and Joints in sup. feet.
D Granite face-work in superficial feet.
E Sandstone face-work.
F Sandstone polish-work.
G Granite boring in lineal feet.
H Sandstone boring in lineal feet.
I Granite wedge grooves in lin. feet.
J Sandstone wedge grooves in lin. feet.
K Granite Lewis holes.
L Sandstone Lewis holes.

A B C D E F G H I J K L
Over, 18641 50494 2944 1025 598 2093 5306 2933 4859 594 1528
43 383 60 44 16
44 409 59 40 16
45 395 59 40 16
46 388 58 40 16
47 685 67 231 80 18
48 361 54 38 16
49 352 54 38 16
50 335 54 52 14
51 322 64 44 14
52 315 64 44 16
53 335 58 49 16
54 339 58 41 16
55 318 54 38 16
56 672 65 231 80 18
57 320 51 38 16
58 318 51 38 16
59 301 51 48 14
60 250 60 41 14
61 273 60 41 16
62 298 55 49 16
63 294 51 41 16
64 294 51 41 16
65 645 55 231 80 18
66 277 49 38 16
67 274 49 38 16
68 250 53 57 16
69 192 43 61 12
70 198 43 61 16
71 282 57 44 16
72 259 49 38 16
73 254 49 38 16
74 645 51 247 80 18
75 209 45 45 16
76 247 53 41 16
77 226 57 52 16
78 165 54 61 12
79 221 54 61 12
80 225 52 49 12
81 368 49 38 16
82 679 115 16
83 846 160 16
84 671 148 16
85 165 399 16
86 157 92 8
87 147 91 8
88 138 90 8
89 129 89 8
90 120 88 8
Total 90 18641 66440 2944 3145 4377 2093 5306 2933 5179 594 2240

No. VII.

ABSTRACT-ACCOUNT of the EXPENCE of ERECTING the BELL-ROCK LIGHT-HOUSE, and of executing the ULTERIOR WORKS connected with that ESTABLISHMENT.

Wages and Premiums.

Wages of artificers while off at the Bell Rock, and in the work-yards at Arbroath and Edinburgh, where the stones were cut and prepared in regular courses, L.11,980 15 8
Premiums to artificers for Sundays’ work and extra hours upon the Rock, and in the Work-yard at Arbroath, 998 14 9
Premiums to seamen, including Sundays’ work at the Bell Rock, 473 5 6
Note.—Masons and smiths were paid at the rate of 3s. 4d.,—mill-wrights 3s. 6d.,—joiners 3s., and labourers at from 2s. 2d. to 2s. 8d. per day; besides lodgings ashore, and victuals while afloat.—The premiums paid to artificers were at the rate of 6d. per hour for extra time; eight hours constituting a day’s work at the Rock.—The seamen were paid at the same rate on Sundays as on week days.
Amount for wages and premiums to artificers, and including premiums to seamen, L.13,452 15 11

Building Materials.

35,952 cubic feet of Sandstone from Mylnefield quarry, dressed to the quarry-moulds, and put on ship-board, L.3,412 18 5
Extra dressing in reducing the courses to regular thicknesses at Mylnfield, 667 2 8
1700 cubic feet of sandstone from Craigleith Quarry for the cornice and parapet wall of the Light-room, 200 0 10
13,964 cubic feet of granite from Rubieslaw and other quarries at Aberdeen, and from Cairngall near Peterhead, 1,979 1 4
Extra dressing in reducing the granite stones to the quarry-moulds, and to regular thicknesses, to suit the respective courses, including cartage and charges of shipping, 1,291 7 2½
40 Tons of Pozzolano-earth in casks, 398 3 4
60 Tons of Aberthaw-limestone, including freight from South Wales, 78 14 2
100 Bushels Parker’s or Roman cement, including casks and shipping charges, 43 12 0
6 Tons of Tarras, including casks and shipping charges, 52 19 10
Casks for carrying lime and sand from the workyard to the Bell Rock, 38 3 3
4824 oaken trenails, from 21 to 24 inches and 6195 oaken wedges, from 12 to 18 inches in length, 216 1 6
Note.—The quarry price of Sandstone varied from 1s. to 2s. 9d., and Granite from 1s. 3d. to 5s. per cubic foot. Pozzolano from L.6 to L.14 per ton. Tarras from L.6, 10s. to L.11 per ton. Limestone was 1s. per ton. Cement varied from 5s. to 6s. 6d. per bushel; oaken trenails from L.1 to L.5 per hundred, and wedges were L.1: 6: 6 per hundred.
Amount for Building Materials, 8,378 4 1½

Implements and Machinery for the Works, including Beacon-house, Cast-iron Railways, &c. &c. (See Plates VIII., IX., X., XIV., XVII., and XVIII.)

4662 cubic feet of Memel and Swedish timber, and 480 Petersburgh deals for the use of the Beacon-house, cast-iron Railways and wharfs upon the Bell Rock, and for making moulds for the stone-cutters, L.1,436 19 7
69 tons 9 cwt. of cast-iron for Railways, 812 15 11
25,893 lb. malleable iron in stanchions, bats, knees, stays, bracing-chains, screw and spear bolts, including other apparatus for the use of the Beacon-house and Railways, 1,244 3 7
19 Tons 13 cwt. 2 qrs. 3 lb. cast-iron, 14,002 lb. malleable iron, and 505 lb. of brass for cranes, winch-machines, and other apparatus, 1,191 14 7½
Cordage for cranes, &c. 409 1 0
Two large Sling or Woolwich-carts, for conveying large blocks of stone, fitted up with wheel and pinion-work for slinging or lifting the stones off the ground, 150 3 6
15,446 lb. quarry and stone-cutters’ tools; 11,934 lb. malleable iron, and 771 lb. steel, used in the work-yard; exclusively of tools, nails, and other furnishings connected with joiners’ and smiths’ shops; but including stone-jacks and common carts used in work-yard, &c. &c., 1,567 10 1½
Note.—The price of fir-timber varied from 3s. to 5s. 6d. per cubic foot; cast-iron from L.10, 10s. to L.23:6:8 per ton; chains and axles, &c. 6½d. to 1s. per lb.; quarry and stone-cutters tools from 6d. to 10d. per lb.; Swedish and British bar-iron from L.21 to L.29 per ton. Steel was 7d. per lb., and brass 1s. 10d. per lb.
Amount for Machinery, &c. 6,812 8 4

Shipping.

Price of the hull of a Prussian fishing-dogger, L.250 0 2
Carpenter-work, altering and fitting up the dogger as the Pharos Floating-light, 1,397 12 8
Two sets of chains, with mushroom anchors, spare shackles and swivels, &c., for mooring her off the Bell Rock, the whole weighing about 13,083 lb. of malleable, and 3200 lb. of cast-iron, 462 9 4
Outfit in hempen cables, sails and rigging, including 11 tons cast-iron, ballast, ship-hearth, cabin-stoves, alarm-bell, &c., 1,664 2 3
Three large copper lanterns, glazed with plate glass, (so constructed, that the ship’s masts passed through them), fitted with brass chandeliers for 60 agitable-lamps, each having a small silvered-copper reflector, 397 1 2½
Freight of a vessel, and expence of laying down the moorings for the Floating-light, 81 5 6
Wear and tear of the Floating-light riding off the Bell Rock, from July 1807 till February 1811, 1,059 11 5½
Advertising the mooring and exhibition of the Floating-light, generally, in the Newspapers of the United Kingdom, 227 18 9
Victualling the crew of the Floating-light, including occasional subsisting money and board-wages while ashore, 1,149 18 7
Pay of the master, mate, principal and assistant light-keepers, and seven seamen, from 1807 to March 1811, 1,632 12 8
8,322 12 5
First Cost and Outfit of the Sir Joseph Banks Tender of 84 tons register, the Sloop Smeaton of 42 tons, the Sloop Patriot of 46 tons, and of four Stone Lighters of about 15 tons each, including wear and tear during the progress of the works, L.5,436 9 7½
Bedding for seamen and artificers during the progress of the works, 349 7 2
Victualling seamen and artificers afloat, including occasional subsisting money for seamen while ashore, 2,930 12 7½
Pay of the masters, mates, and seamen of the respective vessels, 2,434 2 2
Freight of hired vessels bringing stone from Mylnefield, Aberdeen, and Peterhead quarries, and timber and cast-iron from Leith and other ports to Arbroath, 930 17 11
Port charges and sailing disbursements of the several vessels, 358 8 4½
Insurance of Shipping, effected only for a limited period, 647 12 6
14 Mushroom Anchors, weighing 13 tons 7 cwts. 0 qrs. 10 lb. of cast-iron, 235 15 8
28,456 lb. malleable iron, in mooring-chains, shanks of mushroom-anchors, spare swivels and shackles, 891 11 2
16 Large mooring buoys of coopers’ work, and one of carpenters’ work, 456 19 2
Note.—Pay of the masters of the respective vessels in the service was from L.5 to L.6, 6s., mates from L.4 to L.5, 5s., principal light-keeper L.5, 5s., assistant light-keeper L.3, 15s., seamen from L.2, 10s. to L.3, 15s. per month. Officers’ occasional subsisting money 2s., and seamens’ 1s. 8d. per day.
The price of the hulls of the vessels were from L.9, 15s. to L.10 per ton, and cordage from L.77 to L.130 per ton; cordage subject to a discount of 7½ per cent.; other articles generally to 5 per cent.
Amount for shipping, 14,671 16 4½

Light-room, &c. (See Plates XVI. and XX.)

Lantern or Light-room with tinned copper roof, 8 cast-iron sashes, 8 feet in height, glazed with 48 squares of plate-glass, measuring 13½ by 26¾ inches. Malleable iron stays, copper rings, flag-staff, and signal-ball, &c. L.1,135 1 11
24 Reflectors raised to the parabolic-curve, made from copper plated, in the proportion of 6 oz. of silver to each lb. of copper; arranged upon a malleable iron chandelier, furnished with brass fountains, and argand burners, including a train of Revolving-machinery, and two alarm-bells, set upon tripods on the balcony, &c. 1,287 17 2
Balcony-railing of cast-iron, with brass supports and top-rail; and a conductor or thunder-rod extending, from the Light-room to the Rock, 216 0 3
Amount of Light-room, &c. 2,638 19 4

Ulterior Works, &c. (See Plate XII.)

Finishing and Completing the interior of the Light-house, with wainscot partitions,—doors,—trap-ladders,—furniture of oaken-timber for the several apartments,—kitchen range with cast-iron chimney,—tinned-copper oil cisterns—brass and copper bolts and hinges for doors,—window-shutters,—brasslocks,—brass hand-rails for inside stairs,—water-cisterns, and coal magazines, &c. L.1,489 16 6
Erecting permanent Railways upon the Bell Rock, improving the wharfs or landing places, and removing the Beacon-house, 1,338 16 6
Houses erected for the families of the light-keepers and seamen of the Tender, signal-tower, store-houses, and sea-wall, at Arbroath, 4,500 8 3
The price of about 1½ acre of ground for a garden, trenching, and enclosing it for the use of the light-keepers, and seamen, and their families, 1,158 18 10
The price of a pew of 14 sittings in the parish-church of Arbroath, for the use of the Light-keepers and their families, 52 10 0
Note.—Wainscot 7s. 6d. per foot, brass 1s. 8d. to 2s. per lb.
Amount for Ulterior Works, 8,540 10 1

Incidents.

Extracted by
Lachlan Kennedy, Engineer’s Clerk.


Average Price of Provisions.

Average Price of Provisions during the Period of the Bell Rock Works.

Beef 6d. per lb. of 17½ oz. avoirdupois.
Ship-biscuit L.1, 9s. per cwt.
Quartern Loaf 13½d. per loaf, of 4 lb. 5½ oz.
Oat-meal L.1, 11s. per boll, of 140 lb.
Barley 2½d. per lb. of 17½ oz.
Butter 1s. 8d. per lb. of 24 oz.
Salt 10s. per bushel, of 56 lb.
Whisky 11s. per gallon.
Small Beer 1s. 10d. per Scots gallon, of 8 Scots points.

                                                                                                                                                                                                                                                                                                           

Clyx.com


Top of Page
Top of Page