Drainage.

Previous

The number and size of the drains will depend upon the amount of rainfall, the contour of the land, and the natural absorbent character of the soil. In no case should the ditches be less than 1 meter wide and 60 cm. deep, and if loose stones are at hand the sloping sides may be laid with them, which will materially protect them from washing by torrential rains.

These main drains should all be completed prior to planting. Connecting laterals may be opened subsequently, as the necessities of further drainage or future irrigation may demand; shallow furrows will generally answer for these laterals, and as their obliteration will practically follow every time cultivation is given, their construction may be of the cheapest and most temporary nature. Owing to the necessity of main drainage canals and the needful interplanting of shade plants between the rows of cacao, nothing is gained by laying off the land for planting in what is called “two ways,” and all subsequent working of the orchard will consequently be in one direction.

                                                                                                                                                                                                                                                                                                           

Clyx.com


Top of Page
Top of Page