- Absorption, 16, 159.
- Alignment, principles of, 4.
- Alignment, centrality in, 5.
- Alteration in line, 59.
- Assiut Barrage, 11.
- Assouan Dam, 11.
- Banks, construction of, 138.
- — protection of, 139, 175, 178.
- — width and height of, 56.
- Banks and Roads, 53.
- Basin Irrigation, 11.
- Berms, 53.
- Bifurcations, 47.
- Bifurcation, head needed at, 45.
- Borrow pits, 55.
- Branches of Canals, 3.
- Breaches in Banks, 176.
- Bricks used for canal work in India, 88.
- Bridges, 8, 80, 87, 130.
- — Skew, 29, 42.
- Bushing of banks, 178.
- Canal and branches, 20, 47.
- Canal, bed width of, 51.
- — supplied from reservoirs, 3, 13.
- — inundation, 1, 45, 79, 127, 156.
- — perennial, 1.
- Capillarity, 16.
- Cattle GhÁts, 81, 173.
- Cement for lining channels, 160.
- Chainage, 93, 118.
- Channels, alterations in, 97.
- — enlargement of, 97, 139.
- — gradients of, 50.
- — side slopes of, 52.
- Colonization Schemes, 64.
- Command, 2.
- Commanded area, 4.
- Contour lines, 37.
- — plan, 26, 36, 63.
- — survey, 37.
- Crops, failure of, 103, 142.
- — kinds of, 101.
- Culturable commanded area, 26, 113.
- Curves and bends in channels, 8, 139.
- “Delta,” 22, 110.
- Deputy Collector, 90.
- Plan, large scale, 59.
- Postal system, 97.
- Profile walls, 91, 94.
- Project, sketch of, 26.
- Proportion of land to be irrigated, 27, 156.
- Puddle for lining channels, 160.
- Punjab, projects for canals in, 144.
- Punjab rivers, 145, 147.
- Quarters for regulating staff, 88.
- Rabi or winter crop, 23.
- Railings, 88.
- Rain, 9, 22, 100.
- Ramps, 88.
- Ratio of bed width to depth, 50.
- Reduction in size of channel, 128.
- Registers, irrigation, 113.
- Regulation of supply, 103, 121, 127.
- Regulators, 7, 80, 84, 184.
- — permissible heading up, 85.
- Remodellings of channels, 127.
- — of outlets and watercourses, 131, 134.
- Rest Houses, 95.
- Reservoirs, 13.
- Rules for designing canals, Kennedy’s, 48.
- Scheme, cost of, 28, 59.
- Sides, falling in of, 139.
- Sidhnai canal minors, 41.
- Silt, clearance of, 97, 138, 139.
- — deposit, 15, 97.
- — trapping at Headworks, 47.
- Silting and scouring, 15, 48, 98, 139.
- Sirhind Canal, 19, 144.
- — — silting in the head reach of, 98.
- Soil, water-logging of, 10, 24, 102.
- Spoil Banks, 52, 57.
- Subdivisions, canal, 95.
- Subdivisional officer, 96.
- Suboverseer, 96.
- Superintending Engineer, 96.
- Supply carried, 100.
- — distribution of, 14, 118.
- — mean and full, 27, 46, Harvey & Healing, Printers, Manchester Street, Cheltenham.
|
|