The engineer is not directly concerned with the various methods employed in constructing a sea outfall, such matters being left to the discretion of the contractor. It may, however, be briefly stated that the work frequently involves the erection of temporary steel gantries, which must be very carefully designed and solidly built if they are to escape destruction by the heavy seas. It is amazing to observe the ease with which a rough sea will twist into most fantastic shapes steel joists 10 in by 8in, or even larger in size. Any extra cost incurred in strengthening the gantries is well repaid if it avoids damage, because otherwise there is not only the expense of rebuilding the structure to be faced, but the construction of the work will be delayed possibly into another season. In order to ensure that the works below water are constructed in a substantial manner, it is absolutely necessary that the resident engineer, at least, should be able to don a diving dress and inspect the work personally. The particular points to which attention must be given include the proper laying of the pipes, so that the spigot of one is forced home into the socket of the other, the provision and tightening up of all the bolts required to be fixed, the proper driving of the piles and fixing the bracing, the dredging of a clear space in the bed of the sea in front of the outlet pipe, and other matters dependent upon the special form of construction adopted. If a plug is inserted in the open end of the pipes as laid, the rising of the tide will press on the plugged end and be of considerable assistance in pushing the pipes home; it will therefore be necessary to re-examine the joints to see if the bolts can be tightened up any more. Messrs. Siebe, Gorman, and Co., the well-known makers of submarine appliances, have fitted up at their works at Westminster Bridge-road, London, S.E., an experimental tank, in which engineers may make a few preliminary descents and be instructed in the art of diving; and it is distinctly more advantageous to acquire the knowledge in this way from experts than to depend solely upon the guidance of the divers engaged upon the work which the engineer desires to inspect. Only a nominal charge of one guinea for two descents is made, which sum, less out-of-pocket expenses, is remitted to the Benevolent Fund of the Institution of Civil Engineers. It is generally desirable that a complete outfit, including the air pump, should be provided for the sole use of the resident engineer, and special men should be told off to assist him in dressing and to attend to his wants while he is below water. He is then able to inspect the work while it is actually in progress, and he will not hinder or delay the divers. It is a wise precaution to be medically examined before undertaking diving work, although, with the short time which will generally be spent below water, and the shallow depths usual in this class of work, there is practically no danger; but, generally speaking, a diver should be of good physique, not unduly stout, free from heart or lung trouble and varicose veins, and should not drink or smoke to excess. It is necessary, however, to have acquaintance with the physical principles involved, and to know what to do in emergencies. A considerable amount of useful information is given by Mr. R. H. Davis in his "Diving Manual" (Siebe, Gorman, and Co., 5s.), from which many of the following notes are taken. A diving dress and equipment weighs about l75 lb, including a 40 lb lead weight carried by the diver on his chest, a similar weight on his back, and l6lb of lead on each boot. Upon entering the water the superfluous air in the dress is driven out through the outlet valve in the helmet by the pressure of the water on the legs and body, and by the time the top of the diver's head reaches the surface his breathing becomes laboured, because the pressure of air in his lungs equals the atmospheric pressure, while the pressure upon his chest and abdomen is greater by the weight of the water thereon. He is thus breathing against a pressure, and if he has to breathe deeply, as during exertion, the effect becomes serious; so that the first thing he has to learn is to adjust the pressure of the spring on the outlet valve, so that the amount of air pumped in under pressure and retained in the diving dress counterbalances the pressure of the water outside, which is equal to a little under 1/2lb per square inch for every foot in depth. If the diver be 6 ft tall, and stands in an upright position, the pressure on his helmet will be about 3lb per square inch less than on his boots. The breathing is easier if the dress is kept inflated down to the abdomen, but in this case there is danger of the diver being capsized and floating feet upwards, in which position he is helpless, and the air cannot escape by the outlet valve. Air is supplied to the diver under pressure by an air pump through a flexible tube called the air pipe; and a light rope called a life line, which is used for signalling, connects the man with the surface. The descent is made by a 3 in "shot-rope," which has a heavy sinker weighing about 50 lb attached, and is previously lowered to the bottom. A 1-1/4 in rope about 15 ft long, called a "distance- line," is attached to the shot-rope about 3 ft above the sinker, and on reaching the bottom the diver takes this line with him to enable him to find his way back to the shot-rope, and thus reach the surface comfortably, instead of being hauled up by his life line. The diver must be careful in his movements that he does not fall so as suddenly to increase the depth of water in which he is immersed, because at the normal higher level the air pressure in the dress will be properly balanced against the water pressure; but if he falls, say 30 ft, the pressure of the water on his body will be increased by about 15 lb per square inch, and as the air pump cannot immediately increase the pressure in the dress to a corresponding extent, the man's body in the unresisting dress will be forced into the rigid helmet, and he will certainly be severely injured, and perhaps even killed. When descending under water the air pressure in the dress is increased, and acts upon the outside of the drum of the ear, causing pain, until the air passing through the nose and up the Eustachian tube inside the head reaches the back of the drum and balances the pressure. This may be delayed, or prevented, if the tube is partially stopped up by reason of a cold or other cause, but the balance can generally be brought about if the diver pauses in his descent and swallows his saliva; or blocks up his nose as much as possible by pressing it against the front of the helmet, closing the mouth and then making a strong effort at expiration so as to produce temporarily an extra pressure inside the throat, and so blow open the tubes; or by yawning or going through the motions thereof. If this does not act he must come up again Provided his ears are "open," and the air pumps can keep the pressure of air equal to that of the depth of the water in which the diver may be, there is nothing to limit the rate of his descent. Now in breathing, carbonic acid gas is exhaled, the quality varying in accordance with the amount of work done, from .014 cubic feet per minute when at rest to a maximum of about .045, and this gas must be removed by dilution with fresh air so as not to inconvenience the diver. This is not a matter of much difficulty as the proportion in fresh air is about .03 per cent., and no effect is felt until the proportion is increased to about 0.3 per cent., which causes one to breathe twice as deeply as usual; at 0.6 per cent. there is severe panting; and at a little over 1.0 per cent. unconsciousness occurs. The effect of the carbonic acid on the diver, however, increases the deeper he descends; and at a depth of 33 ft 1 per cent. of carbonic acid will have the same effect as 2 per cent. at the surface. If the diver feels bad while under water he should signal for more air, stop moving about, and rest quietly for a minute or two, when the fresh air will revive him. The volume of air required by the diver for respiration is about 1.5 cubic feet per minute, and there is a non-return valve on the air inlet, so that in the event of the air pipe being broken, or the pump failing, the air would not escape backwards, but by closing the outlet valve the diver could retain sufficient air to enable him to reach the surface. During the time that a diver is under pressure nitrogen gas from the air is absorbed by his blood and the tissues of his body. This does not inconvenience him at the time, but when he rises the gas is given off, so that if he has been at a great depth for some considerable time, and comes up quickly, bubbles form in the blood and fill the right side of the heart with air, causing death in a few minutes. In less sudden cases the bubbles form in the brain or spinal cord, causing paralysis of the legs, which is called divers' palsy, or the only trouble which is experienced may be severe pains in the joints and muscles. It is necessary, therefore, that he shall come up by stages so as to decompress himself gradually and avoid danger. The blood can hold about twice as much gas in solution as an equal quantity of water, and when the diver is working in shallow depths, up to, say, 30 ft, the amount of nitrogen absorbed is so small that he can stop down as long as is necessary for the purposes of the work, and can come up to the surface as quickly as he likes without any danger. At greater depths approximately the first half of the upward journey may be done in one stage, and the remainder done by degrees, the longest rest being made at a few feet below the surface. The following table shows the time limits in accordance with the latest British Admiralty practice; the time under the water being that from leaving the surface to the beginning of the ascent:— TABLE No. l7.—DIVING DATA. Stoppages in Total time at 20 ft 10 ft Up to 36 No limit - - 0 to 1 36 to 42 Up to 3 hours - - 1 to 1-1/2 Over 3 hours - 5 6 42 to 48 Up to 1 hour - - 1-1/2 1 to 3 hours - 5 6-1/2 Over 3 hours - 10 11-1/2 48 to 54 Up to 1/2 hour - - 2 1/2 to 1-1/2 hour - 5 7 1-1/2 to 3 hours - 10 12 Over 3 hours - 20 22 54 to 60 Up to 20 minutes - - 2 20 to 45 minutes - 5 7 3/4 to 1-1/2 hour - 10 12 1-1/2 to 3 hours 5 15 22 Over 3 hours 10 20 32 When preparing to ascend the diver must tighten the air valve in his helmet to increase his buoyancy; if the valve is closed too much to allow the excess air to escape, his ascent will at first be gradual, but the pressure of the water reduces, the air in the dress expands, making it so stiff that he cannot move his arms to reach the valve, and he is blown up, with ever-increasing velocity, to the surface. While ascending he should exercise his muscles freely during the period of waiting at each stopping place, so as to increase the circulation, and consequently the rate of deceleration. During the progress of the works the location of the sea outfall will be clearly indicated by temporary features visible by day and lighted by night; but when completed its position must be marked in a permanent manner. The extreme end of the outfall should be indicated by a can buoy similar to that shown in Fig. 33, made by Messrs. Brown, Lenox, and Co. (Limited), Milwall, London, E., which costs about £75, including a 20 cwt. sinker and 10 fathoms of chain, and is approved for the purpose by the Board of Trade. [Illustration: FIG 33 CAN BUOY FOR MARKING OUTFALL SEWER.] It is not desirable to fasten the chain to any part of the outfall instead of using a sinker, because at low water the slack of the chain may become entangled, which by preventing the buoy from rising with the tide, will lead to damage; but a special pile may be driven for the purpose of securing the buoy, at such a distance from the outlet that the chain will not foul it. The buoy should be painted with alternate vertical stripes of yellow and green, and lettered "Sewer Outfall" in white letters 12 in deep. It must be remembered that it is necessary for the plans and sections of outfall sewers and other obstructions proposed to be placed in tidal waters to be submitted to the Harbour and Fisheries Department of the Board of Trade for their approval, and no subsequent alteration in the works may be made without their consent being first obtained. |